Attachment 2: Drawings
Updated
A PDF document (6.6 MB) attached to Mora-Adm New Camp Muir Guide Bldgs, from the Departmental Offices. Due Dec 10, 2026, 12:00 PM (UTC-8).
File name: B08_Attachment_2_Drawings.pdf
The full file is for paid members, or buy this bid alone.
Preview
INDEX
SHEET
TITLE OF SHEET
C2.00
C2.01
C2.02
C2.03
A1.01
A2.10
A2.20
A4.01
A4.02
A5.01
A5.02
A5.10
A9.01
A10.01
A10.02
A10.03
A11.01
A11.02
A12.01
S1.10
S1.11
S1.20
S2.00
S2.10
S2.20
S3.00
S3.10
E0.01
E1.01
E2.01
DEMOLITION PLAN
SITE PLAN
SITE SECTIONS
SITE SECTIONS
ASSEMBLIES & CODE PLAN
FLOOR PLAN
ROOF PLAN
EXTERIOR ELEVATIONS - SHELTER A
EXTERIOR ELEVATIONS - SHELTER B
SHELTER SECTIONS
SHELTER SECTIONS
ENLARGED SHELTER SECTION
REFLECTED CEILING PLAN
EXTERIOR DETAILS
EXTERIOR DETAILS
DOOR & WINDOW DETAILS
INTERIOR DETAILS
INTERIOR DETAILS
DOOR & WINDOW SCHEDULES & FINISH PLAN
DESIGN CRITERIA
SPECIAL INSPECTIONS OF STEEL AND SEISMIC RESISTING SYSTEMS
WOOD PANEL SHEAR WALL SCHEDULES AND NAILING DETAIL & SINGLE PL SCHEDULES
FOUNDATION PLAN
STRUCTURAL FLOOR PLAN
STRUCTURAL ROOF FRAMING PLAN
DETAILS
CONNECTION DETAILS
LEGEND, ABBREVIATIONS, ONE-LINE DIAGRAM
ELECTRICAL PLANS
ELECTRICAL SECTIONS
PROJECT
LOCATION
WASHINGTON STATE MAP
PROJECT LOCATION
PROJECT
LOCATION
MOUNT RAINIER NATIONAL PARK
100% CONSTRUCTION DOCUMENTS
TITLE OF PROJECT
CAMP MUIR CLIMBING FACILITY
UNITED STATES
DEPARTMENT OF THE INTERIOR
LOCATION WITHIN PARK
DRAWING NO.
COVER
CAMP MUIR
PMIS/
PKG.
NO.
MOUNT RAINIER NATIONAL PARK
MORA
NAME OF PARK
307228
xxxxxx
SHEET
OF 31
COWLITZ GLACIER
60 FT
SOLAR ICE
MELTING STATION
(EXISTING)
HISTORIC GUIDE SHELTER
(EXISTING)
DEMOLISH & REMOVE EXISTING
STAIR ASSEMBLY
BUTLER SHELTER
(EXISTING)
APPROXIMATE LIMITS OF
ROCKERY WALL DEMOLITION
DEMOLISH & REMOVE EXISTING
STONE RETAINING WALL TIER
TEMPORARILY SHORE UPHILL
ROCKERY SLOPE AS REQURIED
WEST RESTROOM
(EXISTING)
HELIPAD
(EXISTING)
PROTECT, REMOVE, AND TURN
OVER EXISTING TABLE TO NPS FOR
RELOCATION
DEMOLISH &
REMOVE EXISTING
STORAGE BOX UNITS
DEMOLISH & REMOVE EXISTING
WEATHER STATION TOWER
DEMOLISH & REMOVE EXISTING
GOMBU HUT STRUCTURE
DEMOLISH & REMOVE EXISTING
SUPPORT CABLE ASSEMBLIES,
INCLUDING ANCHORS
1" = 10'
DESIGNED:
L A S K EN
A
EER
SI
IN
E
R55527
EG
ED
I S T ER
G
PROF
S
Y
L EON
UGTE OF WASH I NGT
ST
C2.00
DEMOLITION PLAN
DO
TRAIL, TO PARADISE
(EXISTING)
O NA L EN
N. HARRIS
CHECKED:
D. KENLEY
TECH. REVIEW:
DATE:
12/3/2025
SUB SHEET NO.
C2.00
TITLE OF SHEET
DEMOLITION PLAN
CAMP MUIR CLIMBING FACILITY
MOUNT RAINIER NATIONAL PARK
DRAWING NO.
PMIS/
PKG.
NO.
MORA
307228
SHEET
OF 31
VEGETATION EXTENT, TYP
COWLITZ GLACIER
SOLAR ICE
MELTING STATION
(EXISTING)
HISTORIC GUIDE SHELTER
(EXISTING)
30 FT
BUTLER SHELTER
(EXISTING)
EXPANDED METAL GRATING
PLATFORM, SEE ARCH
D
C2.02
C
C2.02
PT 110
EL: 10077.68
PT 103
EL: 10077.68
CLIMBING SHELTER A
The beginning of the document. Download the full file to read on.
Other documents in this bid
- Attachment 11: Request for Information Responses
- Attachment 13: Camp Muir Environmental Commitments 1
- Attachment 14: Camp Muir - Gabion Memo
- Attachment 15 2026 Quarry Survey Summary
- Attachment 16: Specificaton Comments
- Attachment 1: Specifications
- Attachment 3: Product Cut Sheets
- Attachment 4: Construction Report
- Attachment 5: Wage Determination 5 18 26
- Attachment 8: Past Performance Questionnaire
- Attachment 9: Site Visit Transcript
- Sol