REHABILITATE CLIMBING FACILITIES AT CAMP MUIR

TITLE II DESIGN DEVELOPMENT AND CONSTRUCTION DOCUMENTS SERVICES

MOUNT RAINIER NATIONAL PARK, PIERCE COUNTY, WASHINGTON

100% CONSTRUCTION DOCUMENTS REPORT

PMIS # 307228

DECEMBER 03, 2025

REHABILITATE CLIMBING FACILITIES AT CAMP MUIR

100% CONSTRUCTION DOCUMENTS REPORT

ECI

12.03.2025

140P8525F0011

REHABILITATE CLIMBING FACILITIES AT CAMP MUIR

100% CONSTRUCTION DOCUMENTS REPORT

OVERVIEW

TEAM

EXECUTIVE SUMMARY

DESIGN NARRATIVES

CODES

EXISTING CONDITIONS & SITE PHASING

CULTURAL RESOURCE COORDINATION

PROGRAM

ARCHITECTURAL

GEOTECHNICAL & CIVIL

STRUCTURAL

ELECTRICAL

HAZMAT ASSUMPTIONS

APPENDIX

APPENDIX A: PROJECT SCHEDULE

SEPARATE DOCUMENTS ISSUED WITH REPORT

100% DESIGN DEVELOPMENT DRAWINGS

100% DESIGN DEVELOPMENT SPECIFICATIONS

100% DESIGN DEVELOPMENT PRODUCT CUT SHEETS

100% DESIGN DEVELOPMENT COST ESTIMATE

ECI

12.03.2025

140P8525F0011

REHABILITATE CLIMBING FACILITIES AT CAMP MUIR

100% CONSTRUCTION DOCUMENTS REPORT

REHABILITATE CLIMBING FACILITIES AT CAMP MUIR

TITLE II DESIGN DEVELOPMENT AND CONSTRUCTION DOCUMENTS SERVICES

MOUNT RAINIER NATIONAL PARK, PIERCE COUNTY, WASHINGTON

100% CONSTRUCTION DOCUMENTS REPORT

PMIS # 307228

CONSULTANT PARTICIPANTS

Jason Swift, Architect and Project Manager, ECI
Brian Meissner, Architect and Value Analysis Facilitator, ECI Emily Hess, Astrid Meissner and Monica Sullivan, Architectural Designers, ECI Nathan Harris, Civil Engineer, PND
Sean Baginski, Structural Engineer, PND
Torsten Mayrberger, Geotechnical Engineer, PND
John Lackey, Electrical Engineer, AMC
Jon Bayles, Estimator, JMB

NPS STAKEHOLDER PARTICIPANTS

Colby Mackley: COR
Greg Dudgeon: Superintendent
Josh Boisvert: Concessions Manager
Kevin Skerl: Deputy Superintendent
Mike Hansen: Rainier Aviation Park Manager (acting)
Stefan Lofgren: Climbing Ranger
Stephanie Clarkson: Historic Architect
Teri Tucker: Planning and Compliance

ECI

12.03.2025

140P8525F0011

REHABILITATE CLIMBING FACILITIES AT CAMP MUIR

100% CONSTRUCTION DOCUMENTS REPORT

ECI

12.03.2025

140P8525F0011

REHABILITATE CLIMBING FACILITIES AT CAMP MUIR

100% CONSTRUCTION DOCUMENTS REPORT

EXECUTIVE SUMMARY

Title II Design Services for the Camp Muir Climbing Shelters is based on design criteria developed during Title I services. These included the Schematic Design Report (dated January 19, 2024, by DJ&A) and the Supplemental Design & Value Analysis Report (dated December 31, 2024, by ECI). The Value Analysis Workshop focused on evaluating construction methods for replacement shelters at Camp Muir in Mount