A PDF document (1008 KB) attached to Mora-Adm New Camp Muir Guide Bldgs, from the Departmental Offices. Due Dec 10, 2026, 12:00 PM (UTC-8).
File name: Sol_140PP027R0015.pdf
The full file is for paid members, or buy this bid alone.
Preview
SOLICITATION, OFFER,
AND AWARD
2. TYPE OF SOLICITATION
1. SOLICITATION NO.
SEALED BID (IFB) INVITATION FOR BID
140PP027R0015
(Construction, Alteration, or Repair)
NEGOTIATED (RFP) REQUEST FOR PROPOSAL
3. DATE ISSUED
PAGE
11/02/2026
OF
PAGES
IMPORTANT - The "offer" section on the reverse must be fully completed by offeror. 4. CONTRACT NO.
5. REQUISITION/PURCHASE REQUEST NO.
6. PROJECT NO.
0044060855
CODE
7. ISSUED BY
PW1
NPS ConOps West 1
1 Denver Federal Center, Building 85
P.O. Box 25287
Denver CO 80225-0287
9. FOR
INFORMATION CALL
8. ADDRESS OFFER TO
a. NAME
Janet
b. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)
Milson
907-644-3710
SOLICITATION
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid and "bidder". 10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying number, date)
Mount Rainier National Park (MORA) - Rehabilitate Climbing Facilities at Camp Muir. The National Park Service, Contracting Operations West, is seeking a qualified construction firm for the removal of an existing modular building at Camp Muir and replacing it with two (2) new climbing shelters, along with related site stabilization work. Site preparation will include excavation, slope stabilization, and installation of geotextile fabric and gabion baskets. Demolition work will include removing and disposing of the existing shelter, weather station tower, and retaining wall. The new climbing shelters will be steel-framed and protected with appropriately rated weather barriers, siding, windows, and doors designed to withstand the harsh climate conditions at the site. The contractor will also install electrical conduits to accommodate a future photovoltaic (PV) system. Interior work will include the construction and installation of bunks, storage shelving, and tables within the shelters. This description is not all-inclusive, and work is to be completed in accordance with the attached specifications.
The estimated magnitude of this requirement is between $1,000,000 and $5,000,000. 11. The contractor shall begin performance within
award,
notice to proceed. This performance period is
calendar days and complete it within
mandatory
calendar days after receiving
negotiable. (See 52.211-10
12a. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?
(If "YES", indicate within how many calendar days after award in Item 12b.) YES
NO
).
12b. CALENDAR DAYS
13. ADDITIONAL SOLICITATION REQUIREMENTS:
The beginning of the document. Download the full file to read on.
Other documents in this bid
- Attachment 11: Request for Information Responses
- Attachment 13: Camp Muir Environmental Commitments 1
- Attachment 14: Camp Muir - Gabion Memo
- Attachment 15 2026 Quarry Survey Summary
- Attachment 16: Specificaton Comments
- Attachment 1: Specifications
- Attachment 2: Drawings
- Attachment 3: Product Cut Sheets
- Attachment 4: Construction Report
- Attachment 5: Wage Determination 5 18 26
- Attachment 8: Past Performance Questionnaire
- Attachment 9: Site Visit Transcript