SOLICITATION, OFFER,

AND AWARD

2. TYPE OF SOLICITATION

1. SOLICITATION NO.

SEALED BID (IFB) INVITATION FOR BID

140PP027R0015

(Construction, Alteration, or Repair)

NEGOTIATED (RFP) REQUEST FOR PROPOSAL

3. DATE ISSUED

PAGE

11/02/2026

OF

PAGES

IMPORTANT - The "offer" section on the reverse must be fully completed by offeror. 4. CONTRACT NO.

5. REQUISITION/PURCHASE REQUEST NO.

6. PROJECT NO.

0044060855

CODE

7. ISSUED BY

PW1
NPS ConOps West 1

1 Denver Federal Center, Building 85

P.O. Box 25287
Denver CO 80225-0287

9. FOR

INFORMATION CALL

8. ADDRESS OFFER TO

a. NAME

Janet

b. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)

Milson

907-644-3710

SOLICITATION

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid and "bidder". 10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying number, date)

Mount Rainier National Park (MORA) - Rehabilitate Climbing Facilities at Camp Muir. The National Park Service, Contracting Operations West, is seeking a qualified construction firm for the removal of an existing modular building at Camp Muir and replacing it with two (2) new climbing shelters, along with related site stabilization work. Site preparation will include excavation, slope stabilization, and installation of geotextile fabric and gabion baskets. Demolition work will include removing and disposing of the existing shelter, weather station tower, and retaining wall. The new climbing shelters will be steel-framed and protected with appropriately rated weather barriers, siding, windows, and doors designed to withstand the harsh climate conditions at the site. The contractor will also install electrical conduits to accommodate a future photovoltaic (PV) system. Interior work will include the construction and installation of bunks, storage shelving, and tables within the shelters. This description is not all-inclusive, and work is to be completed in accordance with the attached specifications.
The estimated magnitude of this requirement is between $1,000,000 and $5,000,000. 11. The contractor shall begin performance within
award,

notice to proceed. This performance period is

calendar days and complete it within
mandatory

calendar days after receiving
negotiable. (See 52.211-10

12a. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?

(If "YES", indicate within how many calendar days after award in Item 12b.) YES

NO

).

12b. CALENDAR DAYS

13. ADDITIONAL SOLICITATION REQUIREMENTS: