Attachment 9: Site Visit Transcript
Updated
A PDF document (197 KB) attached to Mora-Adm New Camp Muir Guide Bldgs, from the Departmental Offices. Due Dec 10, 2026, 12:00 PM (UTC-8).
File name: B08_Attachment_9_Site_Visit_Transcript.pdf
The full file is for paid members, or buy this bid alone.
Preview
Camp Muir Contract - Site meeting-20260515_090307Meeting Notes (edited) May 15, 2026, 4:03PM
45m 36s
Attendees
Joshua Boisvert – Commercial Services Manager, Mount Rainier National Park (COR) Juan Roman – Contracting Officer
Sarah Waterworth – Chief of Administration, Mount Rainier National Park Kevin Skerl – Mount Rainier National Park
Nabi Mdnurun Company: ATZ SOLUTION LLC [email protected] Philip Beauchamp
Anthony Moore - Fuller Electric - [email protected] Tom Bardwell and Tim Lovelass - RJS Construction - [email protected]; [email protected]
Lindsay Hiatt - JMG Constructors, LLC - [email protected] Mike Mayer - Mountain Construction - [email protected] Suzanne Montgomery - DRI [email protected]
Philip Beauchamp, Ironwood Commercial Builders, Inc., [email protected] Tyler Nickel, HB Hansen Construction Inc, [email protected] Chirs Norris & Karl Grendze, Northstar, [email protected]; [email protected] Jake Hendrix, Tepa Companies, [email protected]
Jaime Rangel, Far West Construction, [email protected] Jalen Johansen, Johansen Construction, [email protected] Sam Ellingard, JMG Constructors LLC, [email protected] Boisvert, Joshua T 1:51
Well, Juan, I think we can start. We were waiting on the superintendent, but he and the deputy are both really, really in a couple of different spots this morning at the same time. If they come in, I'd like to give them the opportunity to do a welcome, but when you're ready, I think we'll be ready.
In.
Roman, Juan 2:23
Juan Roman. I am the contracting officer for this requirement. I appreciate everybody attending. It's nice to see we got a lot of interest in this project. It's a little different. We're not actually going to the site. But, we'll provide as much information as we can either through this meeting or any follow-up questions that are provided. Boisvert, Joshua T 2:44
Thanks, Juan. Sarah, do you want to introduce yourself and just kind of see who we are and then I'll just jump into it.
Waterworth, Sarah 2:58
Yeah, okay. I'm Sarah Waterworth. I'm the Chief of Admin at Mount Rainier National Park. I'm remotely based in St. Paul, Minnesota.
Skerl, Kevin 3:19
All right, trying to get online here. Hey, good morning, everyone. Thanks for showing up for this critical discussion about a really critical resource here at Mount Rainier. One of the most
The beginning of the document. Download the full file to read on.
Other documents in this bid
- Attachment 11: Request for Information Responses
- Attachment 13: Camp Muir Environmental Commitments 1
- Attachment 14: Camp Muir - Gabion Memo
- Attachment 15 2026 Quarry Survey Summary
- Attachment 16: Specificaton Comments
- Attachment 1: Specifications
- Attachment 2: Drawings
- Attachment 3: Product Cut Sheets
- Attachment 4: Construction Report
- Attachment 5: Wage Determination 5 18 26
- Attachment 8: Past Performance Questionnaire