Attachment 2: Mechanical BOA Drawings FOR BID
Updated
A PDF document (9.1 MB) attached to Mechanical Services Basic Ordering Agreement (BOA), from the Department of Energy. Due Oct 30, 2026, 4:00 PM (UTC-4).
File name: Attachment 2 Mechanical BOA Drawings FOR BID.pdf
The full file is for paid members, or buy this bid alone.
Preview
GENERAL NOTES:
1.
DRAWING SPECIFICATIONS ARE PART OF THIS CONTRACT.
2.
ALL WORK SHOWN ON THESE PLANS SHALL BE PROVIDED UNDER THIS CONTRACT UNLESS SPECIFICALLY CALLED OUT OTHERWISE.
AC
ACCU
3.
ALL WORK SHOWN ON THESE PLANS SHALL BE NEW.
4.
THE DRAWINGS SHOW THE GENERAL ARRANGEMENT OF ALL DUCTWORK, PIPING AND EQUIPMENT AND INDICATE THE REQUIRED SIZE AND POINTS OF TERMINATION OF THE DUCTWORK AND PIPING AND SUGGEST PROPER ROUTING OF SAME. HOWEVER, IT IS NOT THE INTENTION OF THE DRAWINGS TO SHOW ALL NECESSARY OFFSETS, OBSTRUCTIONS OR STRUCTURAL CONDITIONS. IT SHALL BE THE RESPONSIBILITY OF THIS CONTRACTOR TO INSTALL HIS WORK IN SUCH A MANNER THAT IT WILL CONFORM TO THE STRUCTURE, AVOID OBSTRUCTIONS, PRESERVE HEADROOM AND KEEP OPENINGS AND PASSAGEWAYS CLEAR WITHOUT FURTHER CONSTRUCTION OR COST.
5.
6.
7.
8.
9.
10.
INSTALL WORK SO AS TO BE READILY ACCESSIBLE FOR OPERATING, MAINTENANCE AND REPAIR. MINOR DEVIATIONS FROM DRAWINGS MAY BE MADE TO ACCOMPLISH THIS, BUT CHANGES OF MAGNITUDE WHICH INVOLVE EXTRA COST SHALL NOT BE MADE WITHOUT APPROVAL. EQUIPMENT MANUFACTURER'S RECOMMENDED SERVICE CLEARANCES SHALL BE ADHERED TO IN ADDITION TO INDUSTRY STANDARDS AND CODE REQUIREMENT. IF PROPER SERVICE CLEARANCES CAN NOT BE MAINTAINED FOR ANY REASON THEN CONTRACTOR SHALL NOTIFY OWNER AND ARCHITECT ASAP.
THE CONTRACTOR SHALL TAKE PRECAUTIONS AGAINST DAMAGING OR DISRUPTING BUILDING SYSTEMS, WIRING, PIPING OR CONTROL WIRING. ANY DAMAGE TO THESE ITEMS SHALL BE REPAIRED AT THE CONTRACTOR'S COST, WITHIN COST, WITHIN THIS CONTRACT PERIOD FOR SUBSTANTIAL COMPLETION. THE CONTRACTOR SHALL REPAIR AND RESTORE TO ORIGINAL CONDITION ANY EQUIPMENT OR MATERIALS DAMAGED IN THE PROCESS OF INSTALLATION, AND DEMOLITION TO THE SATISFACTION OF THE OWNER'S REPRESENTATIVE.
11.
THE CONTRACTOR SHALL MAKE REPAIRS USING THE SAME MATERIALS, AT THE CONTRACTOR'S COST.
12.
THE CONTRACTOR SHALL INCUR ALL COSTS AND BURDENS ASSOCIATED WITH LOST OR STOLEN EQUIPMENT AND MATERIALS.
13.
HOT WATER PUMP
HR
HOT WATER RETURN
HS
HOT WATER SUPPLY
AL
ACOUSTICAL LINING
HZ
HERTZ
AS
AIR SEPARATOR
IN.
INCHES
AV
AIR VENT
B
BOILER
K
BNL EQUIPMENT DESIGNATION LETTER
BB
BASEBOARD
L
LENGTH
BHP
BRAKE HORSEPOWER
LAT
LEAVING AIR TEMPERATURE
BOT.
BOTTOM
LFT
LEAVING FLUID TEMPERATURE
BSMT.
BASEMENT
LWCO
IN.W.G.
INCHES WATER GAUGE
LWT
LEAVING WATER TEMPERATURE
BTU/HR
MAX.
MAXIMUM
CONDENSATE
MBH
THOUSAND BTUH
CAP.
CAPACITY
MCA
MINIMUM CIRCUIT AMPACITY
CFM
CUBIC FEET PER MINUTE
MER
MECHANICAL EQUIPMENT ROOM
CW1
CITY WATER SUPPLY
MEZZ.
MEZZANINE
CR
CHILLED WATER RETURN
MIN.
MINIMUM
CS
CHILLED WATER SUPPLY
The beginning of the document. Download the full file to read on.
Other documents in this bid
- Encl. 1 - Attachment 1 Technical Specifications dated
- Encl. 1 - Attachment 2
- Encl. 1 - Attachment 3 Schedule of Unit Rates
- Encl. 1 - Attachment 5 Release of Claims dated
- Encl. 1 - Attachment 6 Payment Bond dated
- Encl. 1 - Attachment 7 Performance Bond dated
- Enclosure 1 - Draft Basic Ordering Agreement
- Enclosure 2 - Qualification Criteria Form
- Enclosure 7 - BSA Construction Rev25
- Enclosure 8 - BSA Supp Work on Site Rev25
- Solicitation
- Amendment 1: Solicitation