Home / Renovate Suite H8, Building 3 / Document

Attachment 3: Suite H8 Specifications Book Vol 2

Updated

A PDF document (1.5 MB) attached to Renovate Suite H8, Building 3, from the Department of the Air Force. Due Nov 2, 2026, 3:00 PM (UTC-5).

File name: FA875126Q0013 Attachment 3 Suite H8 Spec Book Vol 2.pdf

Download the full documentSee the bid

The full file is for paid members, or buy this bid alone.

Preview

RENOVATE H8

LABORATORY, B3

TECHNICAL SPECIFICATIONS

VOL. 2
For

AIR FORCE RESEARCH LABORATORY

ROME RESEARCH SITE

ROME, NEW YORK 13441

PROJECT NUMBER: ULDF 200308AE

Prepared By

TOWNE ENGINEERING, P.C.

CONSULTING ENGINEERS

18 South Street

Utica, New York
315.733.9000

May 4, 2026

SECTION

TITLE

01 11 00

Summary of Work

01 14 00

Work Restrictions

01 30 00

Administrative Requirements

01 32 16

Project Schedule

01 33 00

Submittal Procedures

01 35 26

Safety Requirements

01 42 00

Sources for References Publications

01 45 00

Quality Control

01 45 35

Special Inspections

01 50 00

Temporary Facilities

01 57 19

Temporary Environmental Controls

01 74 19

Construction Waste Management and Disposal

01 78 00

Closeout Submittals

01 78 23

Operation and Maintenance Data

02 41 00

Demolition and Deconstruction

03 30 00

Cast-In-Place Concrete

04 20 00

Unit Masonry

05 12 00

Structural Steel

05 30 00

Steel Decks

05 40 00

Cold-Formed Metal Framing

06 10 00

Rough Carpentry

07 21 13

Board and Block Insulation

07 21 16

Mineral Fiber Blanket Insulation

07 53 23

Ethylene-Propylene-Diene Monomer Roofing

07 60 00

Flashing and Sheet Metal

GENERAL REQUIREMENTS TOC - 1

SECTION

TITLE

07 84 00

Firestopping

07 92 00

Joint Sealants

08 11 13

Steel Doors and Frames

08 11 19

Stainless Steel Doors

08 16 13

Aluminum Flush Doors

08 31 00

Access Doors and Panels

08 71 00

Door Hardware

08 81 00

Glazing

09 22 00

Supports for Plaster and Gypsum Board

09 29 00

Gypsum Board

09 51 00

Acoustical Ceilings

09 65 00

Resilient Flooring

09 69 13

Rigid Grid Access Flooring

09 90 00

Paints and Coatings

10 44 16

Fire Extinguishers

13 21 13

Walkable Ceiling System

21 13 13

Wet Pipe Sprinkler Systems, Fire Protection

22 00 00

Plumbing, General Purpose

23 05 15

Common Piping for HVAC

23 05 93

Testing, Adjusting, and Balancing for HVAC

23 09 00

Instrumentation and Control for HVAC

23 09 93

Sequences of Operation for HVAC Control

23 30 00

HVAC Air Distribution

23 51 70

Electric Duct Heaters

GENERAL REQUIREMENTS TOC - 2

SECTION

TITLE

23 51 79

Unit Heaters

23 52 70

Humidifiers

23 53 30

Central Station Heating, Ventilating and Air Conditioning Units, Interior

23 53 70

Power Roof Ventilators, Centrifugal

23 53 82

Laboratory Exhaust Fans

23 55 92

Adjustable Frequency Controllers

26 51 00

Interior Lighting

26 05 19.00 10

Insulated Wire and Cable

26 05 48

Seismic Protection for Electrical Equipment

26 08 00

Apparatus Inspection and Testing

26 20 00

Interior Distribution System

26 29 23

Adjustable Speed Drive (ASD) Systems Under 600 Volts

26 33 53

Static Uninterruptible Power Supply (UPS)

26 41 00

Lightening Protection System

27 10 00

Building Telecommunications Cabling System

The beginning of the document. Download the full file to read on.