Klepper, Hahn & Hyatt - NYSED Professional Engineering
Services Certificate No. 021270 EXPIRATION 12/31/26
D
OFE
6437
A
SSION
N
SE
o.0
GI
NEE
R
LICEN
N
PR
L
E
EXPIRATION DATE 11/30/28
BEAM:
SEE PLAN
JOIST:
SEE PLAN
SIMPSON
LUS
HANGER
TYP. JOIST TO BEAM DETAIL
JOIST HANGER, TYP.
JAD
GJC
FASTENERS @12" O.C.
2-PLY
3-PLY
TYP. MULTI-PLY FASTENING DETAIL
JD-001
TYPICAL WOOD PALLETTE
3/4" = 1'1'-0"
0"
NOTE:
REMOVE EXISTING X-BRACING WHERE NEW JOISTS WILL BE INSTALLED. AFTER NEW JOISTS ARE INSTALLED, REINSTALL X-BRACING OR BLOCKING AT THE ORIGINAL X-BRACE LOCATIONS.
SIMPSON TB
SCREWS
SIMPSON TB
SCREWS
BEAM: SEE
PLAN
BEAM: SEE
PLAN
TYPICAL WOOD TO STEEL FASTENING DETAILS
OPENING
2x8 MIN. HEADER
OR MATCH EXIST.
JOISTS
JD-001
< 4'4'-0"
0" OPENING
4'4'-0"
0" < OPNEING <6'-0"
CASE 1
CASE 2
TYPICAL OPENING DETAIL
3/4" = 1'-0"
1'-0"
JOISTS OR
RAFTERS
16 GA. TIES W/
(8) 16d NAILS
MIN. PER
CONN.
JOIST: SEE PLAN
2x_ PLATE NOT WIDER
THAN TUBE FACE
TYP. WOOD TO STEEL BEARING DETAIL
OPENING
4"
MIN.
3"
MIN
.
JOISTS OR
RAFTERS
ADD'L L TRIMMER
TO DOUBLE EXIST.
JOIST (SIZE TO
MATCH EXIST.)
1 1/
2"
MI
N.
SIMPSON WSNTL
SERIES SCREW
POWER ACTUATED
FASTENERS @ 12"
O.C.
PROVIDE BLOCKING WHEN
STEEL BEAM IS DEEPER THAN
WOOD JOIST
4"
MIN
.
COLUMN/BEAM: SEE PLAN
1 1/
2"
MI
N.
2x_ PLATE NOTE
WIDER THAN BEAM
FLANGE
SIMPSON BA
HANGER
2x_ PLATE NOT
WIDER THAN BEAM
FLANGE
.
MIN
"
1 1/
LRC
ADD'L L TRIMMER
TO DOUBLE EXIST.
JOIST (SIZE TO
MATCH EXIST.)
DOUBLE
HEADERS(SIZE TO
MATCH EXIST.
JOISTS)
MAY 04, 2026
TYPICAL WOOD DETAILS
RENOVATE H8
LABORATORY, B3
113000
JD-001
The beginning of the document. Download the full file to read on.
Other documents in this bid
- Attachment 2: Suite H8 Specifications Book Vol 1
- Attachment 3: Suite H8 Specifications Book Vol 2
- Attachment 4: B3 Lighting Floor Plan
- Attachment 5: AFRL Statement of Work-Performance Work Statement Supplemental Requirements (Construction)
- Attachment 6: Price Schedule
- Solicitation - Sep 3
- Bid document
- Bid document
- Plumbing General Purpose
- Bid document
- Metal Wall Panels
- Attachment 9: Submission Complete Set Addendum 1