Attachment 4: B3 Lighting Floor Plan
Updated
A PDF document (268 KB) attached to Renovate Suite H8, Building 3, from the Department of the Air Force. Due Nov 2, 2026, 3:00 PM (UTC-5).
File name: FA875126Q0013 Attachment 4 B3 Lighting Floor Plan.pdf
The full file is for paid members, or buy this bid alone.
Preview
WattStopper Devices
G8-P
LVP-G8-8
UP
LMDC-48.9,10.2
LMBC-61 LMBC
UP
LMDM-61.1.1
LABEL
PART #
LOCATION
LMBC
CONNECTION
LMBC-61
LMBC-300
Corridor G
-
LMRC-61.1,2,3
LMRC-213
Corridor 8
(N Closet)
LMBC-61
LMDM-61.1.1
LMSW-211
Corridor 8
LMBC-61
LMDM-61.2.1
LMSW-211
H8-B
LMBC-61
LMDC-61.2.2
LMDC-100
H8-B
LMBC-61
LMDC-61.2.3
LMDC-100
H8-B
LMBC-61
LMDC-61.3.1
LMDC-100
Corridor 8
LMBC-61
LMDC-35.3.2
LMDC-100
Corridor 8
LMBC-61
LMDC-61.3.3
LMDC-100
Corridor 8
LMBC-61
LMRC-61.4,5,6
LMRC-213
Corridor 8
LMBC-61
LMDM-61.4.1
LMSW-211
H8-M
LMBC-61
LMDX-61.4.2
LMDX-100
H8-M
LMBC-61
LMDX-61.4.3
LMDX-100
H8-M
LMBC-61
LMDX-61.4.4
LMDX-100
H8-M
LMBC-61
LMDM-61.5.1
LMSW-211
Corridor 8
LMBC-61
LMDC-61.6.1
LMDC-100
H8-A
LMBC-61
LMRC-61.7,8,9
LMRC-213
H8-C
LMBC-61
LMDM-61.7.1
LMSW-211
H8-K
LMBC-61
LMDX-61.7.2
LMDX-100
H8-K
LMBC-61
LMDX-71.7.3
LMDX-100
H8-K
LMBC-61
LMDX-71.7.4
LMDX-100
H8-K
LMBC-61
LMDM-61.8.1
LMSW-211
H8-L
LMBC-61
LMDC-61.8.2
LMDC-100
H8-L
LMBC-61
LMDC-61.8.3
LMDC-100
H8-L
LMBC-61
LMDM-61.9.1
LMSW-211
H8-C
LMBC-61
LMDW-33.4.3
LMDW-101
Roof Access
LMBC-33
SERIAL
NUMBER
WS
LMRC-61.1,2,3 (Load A)
HVP-H8-1 #21
LMRC-61.1,2,3
LMRC
LMDC-61.2.2
LMRC
UP
LMRC-33.4
HVP-H8-1
DOWN
MDX-34.2.5
LMRC-61.1,2,3 (Load B)
LMDW-33.4.1
LMDM-61.2.1
WS
H8-B
LMDC-61.3.1
H8-D
LMRC-33.4
H8-D
LMDM-61.5.1
Suite H8
WS
MDX-34.2.4
LMDX-33.4.2
LMRC-61.4,5,6 (Load B)
LMDC-61.2.3
LMDW-33.4.3
LMRC-61.1,2,3 (Load C)
LVP-H7-1
H8-D
Corridor 8
H8-H
H8-F
H8-E
LMDC-61.3.2
LMRC-61.7,8,9 (Load C)
H8-C
HVP-H8-1 #19
LMRC-61.4,5,6
LMRC
MDX-34.2.3
LMRC-61.7,8,9
LMDM-61.9.1
LMRC
WS
LMRC-61.4,5,6 (Load A)
LMDX-61.7.4
1/8"=1'-0"
LMRC-61.7,8 (Load A)
LMDM-61.8.1
WS
E
RC-34.2,3 LMRC
HVP-H8-1 #24
LMDX-61.4.4
LVP-H7-1 #5
MRC-34.4 LMRC
N BUILDING 3 MEZZ./ROOF PLAN
AREA ABOVE SUITE H8
LMDC-61.8.2
LVP-H8-4
LMRC-61.7,8 (Load B)
E
LVP-H7-1 #5
E
H8-M
H8-K
E
H8-L
LMDC-61.3.3
DM-34.2.1
WS
WS
LMDC-61.8.3
LMDC-61.6.1
MDM-34.3.1
WS
WS
E
LMDM-61.4.1
LMDX-61.4.3
2,3.2
LMDX-61.4.2
E
LMDM-61.7.1
LMDX-61.7.2
LMDX-61.7.3
H8-A
(Load A)
LMRC-61.4,5,6 (Load C)
N BUILDING 3 FLOOR PLAN
SUITE H8 LIGHTING
1/8"=1'-0"
LIGHTING CONTROL NOTES:
1. PROVIDE DEVICES AS SHOWN ON NEW LIGHTING CONTROL LAYOUT PLANS AND WATTSTOPPER DEVICE SCHEDULE ON THIS PAGE. ATTACH SERIAL NUMBER STICKERS PROVIDED WITH NEW DEVICES IN DEVICE SCHEDULE AS NECESSARY. FOR RELOCATED DEVICES RECORD SERIAL NUMBERS IN SCHEDULE.
LIGHTING LOAD A
LIGHTING LOAD B
2. MOUNT MOTION SENSORS (LMDC-100, LMDX-100) IN CEILING AT EXACT LOCATIONS SHOWN ACCORDING TO MANUFACTURER'S INSTRUCTIONS.
LIGHTING LOAD C
3. MOTION DETECTOR SWITCH (LMDW-101) LOCATED AT ROOF ACCESS IS A DISCONTINUES DEVICE WHICH WILL BE PROVIDED BY THE GOVERNMENT. CONNECT TO EXISTING ROOM NETWORK ON MEZZANINE LEVEL
The beginning of the document. Download the full file to read on.
Other documents in this bid
- Attachment 2: Suite H8 Specifications Book Vol 1
- Attachment 3: Suite H8 Specifications Book Vol 2
- Attachment 5: AFRL Statement of Work-Performance Work Statement Supplemental Requirements (Construction)
- Attachment 6: Price Schedule
- Solicitation - Sep 3
- Bid document
- Bid document
- Plumbing General Purpose
- Bid document
- Bid document
- Metal Wall Panels
- Attachment 9: Submission Complete Set Addendum 1