Home / TOTAL ENGINEERING AND INTEGRATION SERVICES (TEIS) IV… / Document

Attachment 55: Contract Data Requirements List TS26 Project Concurrence Memo

Updated

A PDF document (111 KB) attached to TOTAL ENGINEERING AND INTEGRATION SERVICES (TEIS) IV On-Ramp Opportunity, from the Department of the Army. Due Oct 30, 2026, 4:00 PM (UTC-6).

File name: ATT0055 CDRL TS26 Project Concurrence Memo.pdf

Download the full documentSee the bid

The full file is for paid members, or buy this bid alone.

Preview

CONTRACT DATA REQUIREMENTS LIST

Form Approved

OMB No. 0704-0188

(1 Data Item)

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.

B. EXHIBIT

C. CATEGORY:

D. SYSTEM/ITEM

1. DATA ITEM NO.

TS26

E. CONTRACT/PR NO.

2. TITLE OF DATA ITEM

17. PRICE GROUP

Project Concurrence Memorandum (PCM)

5. CONTRACT REFERENCE

N/A

8. APP CODE

F. CONTRACTOR

3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.)

7. DD 250 REQ

9. DIST STATEMENT

REQUIRED

18. ESTIMATED

TOTAL PRICE

6. REQUIRING OFFICE

Sample Task 2 para 3.1.1.2, 3.2.3

10. FREQUENCY

12. DATE OF FIRST SUBMISSION

11. AS OF DATE

13. DATE OF SUBSEQUENT

SUBMISSION

HQUSAISEC ELIE-ISE-TS

14.

DISTRIBUTION

b. COPIES

a. ADDRESSEE

16. REMARKS

TM

Date of first and subsequent submissions: As specified in the Government issued Project Notification (PN) Form.

COR

Final

Draft

Reg

Repro

Project Concurrence Memorandums (PCM) shall be developed in accordance with this CDRL and with reference to TTP 12-01. PCMs (draft and final) shall be delivered as specified in the Project Notification (PN) Form. Delivery of the FINAL PCM shall be 5 days after receipt of comments from the TM. If comments are not provided within 10 business days following delivey of the DRAFT PCM, the DRAFT will become the FINAL deliverable.
PCMs are developed using the standard format. Each section of the PCM is technically complete and written using good grammar and sentence structure. All acronyms are spelled out at the first usage. Enclosures to the PCM will not be embedded in the Word version of the PCM unless the enclosure was developed in Word or can be embedded in the PCM without loss of quality or clarity. Enclosures to the PCM are provided in both the native

The beginning of the document. Download the full file to read on.

Other documents in this bid