Attachment 58: Contract Data Requirements List TS29 Trip Report
Updated
A PDF document (108 KB) attached to TOTAL ENGINEERING AND INTEGRATION SERVICES (TEIS) IV On-Ramp Opportunity, from the Department of the Army. Due Oct 30, 2026, 4:00 PM (UTC-6).
File name: ATT0058 CDRL TS29 Trip Report.pdf
The full file is for paid members, or buy this bid alone.
Preview
CONTRACT DATA REQUIREMENTS LIST
Form Approved
OMB No. 0704-0188
(1 Data Item)
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.
B. EXHIBIT
C. CATEGORY:
D. SYSTEM/ITEM
1. DATA ITEM NO.
TS29
2. TITLE OF DATA ITEM
F. CONTRACTOR
17. PRICE GROUP
3. SUBTITLE
Trip Report
4. AUTHORITY (Data Acquisition Document No.)
5. CONTRACT REFERENCE
N/A
7. DD 250 REQ
E. CONTRACT/PR NO.
9. DIST STATEMENT
REQUIRED
8. APP CODE
18. ESTIMATED
TOTAL PRICE
6. REQUIRING OFFICE
Sample Task 2 para 3.0, 3.1.5
10. FREQUENCY
12. DATE OF FIRST SUBMISSION
11. AS OF DATE
13. DATE OF SUBSEQUENT
SUBMISSION
HQUSAISEC ELIE-ISE-TS
14.
DISTRIBUTION
b. COPIES
16. REMARKS
a. ADDRESSEE
Final
Draft
TM
1. Date of first and subsequent submissions: No later than (NLT) 5 business days after each COR trip completion for the DRAFT trip report. Delivery of the FINAL trip report shall be 5 business days after receipt of comments from the Technical Monitor (TM). If comments are not provided within 10 business days of delivery of the DRAFT trip report, the DRAFT will become the FINAL deliverable.
Reg
Repro
All travel will be conducted in accordance with Joint Travel Regulations (JTR). If multiple personnel on the same task order support a travel task, only ONE trip report will be required.
2. Format
(a) Report shall be written for printing on 8 1/2" X 11" standard letter size paper (Portrait orientation) although necessary attachments, figures, and sketches may be submitted in a size/orientation that best displays the information being presented. (b) Microsoft Word Font shall be Arial, size 12.
(c) Each page beyond the first page shall have a header identifying the travel task, project
The beginning of the document. Download the full file to read on.
Other documents in this bid
- Attachment 1: TEIS IV Revised Performance Work Statement
- Attachment 2.5 item a CO 2-2023 USAISEC OPSEC Plan
- Attachment 3 2.5 item b 24-004 USAISEC Drafting Guide
- Attachment 4 2.5 item c 18-033 USAISEC VIS Software Design Criteria
- Attachment 5 2.5 item d SIPRNET Tech Impl Criteria V7
- Attachment 6 2.5 item e 13-033-1 Instructional Guide for Developing EIPs
- Attachment 7 2.5 item i UFC 4-140-03
- Attachment 8 2.5 item j I3A Technical Criteria (for OSP Only) - Copy
- Attachment 9 2.5 item n DISN-EN ICAN-DI Standards Specifications v1 09f
- Attachment 10 2.5 item f USAISEC Cyber Security Assessment and Security Engineering Manual V2.1
- Attachment 13: Contract Data Requirements List A003
- Attachment 24 1.6.1B ESS Network Diagram