Home / TOTAL ENGINEERING AND INTEGRATION SERVICES (TEIS) IV… / Document

Attachment 58: Contract Data Requirements List TS29 Trip Report

Updated

A PDF document (108 KB) attached to TOTAL ENGINEERING AND INTEGRATION SERVICES (TEIS) IV On-Ramp Opportunity, from the Department of the Army. Due Oct 30, 2026, 4:00 PM (UTC-6).

File name: ATT0058 CDRL TS29 Trip Report.pdf

Download the full documentSee the bid

The full file is for paid members, or buy this bid alone.

Preview

CONTRACT DATA REQUIREMENTS LIST

Form Approved

OMB No. 0704-0188

(1 Data Item)

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.

B. EXHIBIT

C. CATEGORY:

D. SYSTEM/ITEM

1. DATA ITEM NO.

TS29

2. TITLE OF DATA ITEM

F. CONTRACTOR

17. PRICE GROUP

3. SUBTITLE

Trip Report

4. AUTHORITY (Data Acquisition Document No.)

5. CONTRACT REFERENCE

N/A

7. DD 250 REQ

E. CONTRACT/PR NO.

9. DIST STATEMENT

REQUIRED

8. APP CODE

18. ESTIMATED

TOTAL PRICE

6. REQUIRING OFFICE

Sample Task 2 para 3.0, 3.1.5

10. FREQUENCY

12. DATE OF FIRST SUBMISSION

11. AS OF DATE

13. DATE OF SUBSEQUENT

SUBMISSION

HQUSAISEC ELIE-ISE-TS

14.

DISTRIBUTION

b. COPIES

16. REMARKS

a. ADDRESSEE

Final

Draft

TM

1. Date of first and subsequent submissions: No later than (NLT) 5 business days after each COR trip completion for the DRAFT trip report. Delivery of the FINAL trip report shall be 5 business days after receipt of comments from the Technical Monitor (TM). If comments are not provided within 10 business days of delivery of the DRAFT trip report, the DRAFT will become the FINAL deliverable.

Reg

Repro

All travel will be conducted in accordance with Joint Travel Regulations (JTR). If multiple personnel on the same task order support a travel task, only ONE trip report will be required.

2. Format

(a) Report shall be written for printing on 8 1/2" X 11" standard letter size paper (Portrait orientation) although necessary attachments, figures, and sketches may be submitted in a size/orientation that best displays the information being presented. (b) Microsoft Word Font shall be Arial, size 12.
(c) Each page beyond the first page shall have a header identifying the travel task, project

The beginning of the document. Download the full file to read on.

Other documents in this bid