Attachment 6: DB Wage Determination (Mod 5)
Updated
A PDF document (81 KB) attached to Facility Readiness and Maintenance Execution (FRAME) Request for Proposal (RFP) - DRAFT, from the Department of the Air Force. Due Jan 31, 2027, 4:30 PM (UTC-8).
File name: Attch 6 DB WD CA20260014 (Mod 5).pdf
The full file is for paid members, or buy this bid alone.
Preview
"General Decision Number: CA20260014 07/14/2026
State: California
Construction Types: Building, Heavy and Highway
Counties: California Counties of
Santa Barbara
Building Construction Projects
Dredging Projects-Includes Dredging Projects (does not include hopper dredge work) Heavy Construction Projects (excludes water well drilling) Highway Construction Projects
Modification Number
Publication Date
01/30/2026
05/18/2026
07/14/2026
ASBE0005-002 07/01/2024
Rates
ASBESTOS WORKERS/INSULATOR
(INCLUDES THE
APPLICATION OF ALL INSULATING MATERIALS, PROTECTIVE
COVERINGS, COATINGS, AND FINISHES TO ALL TYPES OF
---------------------------------------------------------------ASBE0005-002 09/01/2024
Rates
FIRE STOP TECHNICIAN
(APPLICATION OF FIRESTOPPING
MATERIALS FOR WALL OPENINGS AND PENETRATIONS IN
---------------------------------------------------------------ASBE0005-004 07/04/2022
Rates
ASBESTOS REMOVAL WORKER/HAZARDOUS MATERIAL HANDLER
(INCLUDES PREPARATION, WETTING, STRIPPING,
REMOVAL, SCRAPPING, VACUUMING, BAGGING AND
DISPOSING OF ALL INSULATION MATERIALS FROM
MECHANICAL SYSTEMS, WHETHER THEY CONTAIN ASBESTOS
---------------------------------------------------------------BOIL0092-003 01/01/2024
Rates
---------------------------------------------------------------BRCA0004-003 05/01/2024
Rates
---------------------------------------------------------------BRCA0018-008 06/01/2024
Fringes
26.52
Fringes
20.65
Fringes
13.37
Fringes
42.11
Fringes
20.29
Rates
---------------------------------------------------------------BRCA0018-010 09/01/2024
Rates
---------------------------------------------------------------BRCA0018-011 06/01/2023
Rates
---------------------------------------------------------------CARP0213-001 07/01/2025
Rates
CARPENTER: (1) CARPENTER, CABINET INSTALLER,
INSULATION INSTALLER, HARDWOOD FLOOR WORKER AND
ACOUSTICAL INSTALLER
FOOTNOTE: WORK OF FORMING
IN THE CONSTRUCTION OF OPEN CUT SEWERS OR STORM
DRAINS, ON OPERATIONS IN WHICH HORIZONTAL LAGGING
IS USED IN CONJUNCTION WITH STEEL H-BEAMS DRIVEN OR
PLACED IN PRE- DRILLED HOLES, FOR THAT PORTION OF A
LAGGED TRENCH AGAINST WHICH CONCRETE IS POURED,
NAMELY, AS A SUBSTITUTE FOR BACK FORMS (WHICH WORK
IS PERFORMED BY PILEDRIVERS): $0.13 PER HOUR
CARPENTER: (2) MILLWRIGHT
FOOTNOTE: WORK OF
FORMING IN THE CONSTRUCTION OF OPEN CUT SEWERS OR
STORM DRAINS, ON OPERATIONS IN WHICH HORIZONTAL
LAGGING IS USED IN CONJUNCTION WITH STEEL H-BEAMS
DRIVEN OR PLACED IN PRE- DRILLED HOLES, FOR THAT
PORTION OF A LAGGED TRENCH AGAINST WHICH CONCRETE
The beginning of the document. Download the full file to read on.
Other documents in this bid
- Attachment 1: FRAME Performance Work Statement - draft
- Attachment 2: Apdx H Environmental Reqs - draft
- Attachment 2: Apdx J Antenna Tower Resp List draft
- Attachment 3: Consolidated DID Files draft
- Attachment 4: FRAME Incentive Plan - Draft
- Attachment 5: Appendix B Wage Rate Tables redacted
- Attachment 5: CBA IBEW 2024 12949 Appdx A redacted
- Attachment 6: DB Wage Determination (Mod 6)
- Attachment 8: Section L - draft
- Attachment 9: Section M - draft
- Request for Information Atch 1 Industry Day Agenda 22