Home / Facility Readiness and Maintenance Execution (FRAME)… / Document

Attachment 6: DB Wage Determination (Mod 5)

Updated

A PDF document (81 KB) attached to Facility Readiness and Maintenance Execution (FRAME) Request for Proposal (RFP) - DRAFT, from the Department of the Air Force. Due Jan 31, 2027, 4:30 PM (UTC-8).

File name: Attch 6 DB WD CA20260014 (Mod 5).pdf

Download the full documentSee the bid

The full file is for paid members, or buy this bid alone.

Preview

"General Decision Number: CA20260014 07/14/2026
State: California
Construction Types: Building, Heavy and Highway
Counties: California Counties of
Santa Barbara

Building Construction Projects
Dredging Projects-Includes Dredging Projects (does not include hopper dredge work) Heavy Construction Projects (excludes water well drilling) Highway Construction Projects

Modification Number

Publication Date
01/30/2026
05/18/2026
07/14/2026

ASBE0005-002 07/01/2024

Rates

ASBESTOS WORKERS/INSULATOR

(INCLUDES THE

APPLICATION OF ALL INSULATING MATERIALS, PROTECTIVE

COVERINGS, COATINGS, AND FINISHES TO ALL TYPES OF

---------------------------------------------------------------ASBE0005-002 09/01/2024

Rates

FIRE STOP TECHNICIAN

(APPLICATION OF FIRESTOPPING

MATERIALS FOR WALL OPENINGS AND PENETRATIONS IN

---------------------------------------------------------------ASBE0005-004 07/04/2022

Rates

ASBESTOS REMOVAL WORKER/HAZARDOUS MATERIAL HANDLER

(INCLUDES PREPARATION, WETTING, STRIPPING,

REMOVAL, SCRAPPING, VACUUMING, BAGGING AND

DISPOSING OF ALL INSULATION MATERIALS FROM

MECHANICAL SYSTEMS, WHETHER THEY CONTAIN ASBESTOS

---------------------------------------------------------------BOIL0092-003 01/01/2024

Rates
---------------------------------------------------------------BRCA0004-003 05/01/2024

Rates
---------------------------------------------------------------BRCA0018-008 06/01/2024

Fringes

26.52

Fringes
20.65

Fringes

13.37

Fringes
42.11

Fringes
20.29

Rates
---------------------------------------------------------------BRCA0018-010 09/01/2024

Rates
---------------------------------------------------------------BRCA0018-011 06/01/2023

Rates
---------------------------------------------------------------CARP0213-001 07/01/2025

Rates
CARPENTER: (1) CARPENTER, CABINET INSTALLER,

INSULATION INSTALLER, HARDWOOD FLOOR WORKER AND

ACOUSTICAL INSTALLER

FOOTNOTE: WORK OF FORMING

IN THE CONSTRUCTION OF OPEN CUT SEWERS OR STORM

DRAINS, ON OPERATIONS IN WHICH HORIZONTAL LAGGING

IS USED IN CONJUNCTION WITH STEEL H-BEAMS DRIVEN OR

PLACED IN PRE- DRILLED HOLES, FOR THAT PORTION OF A

LAGGED TRENCH AGAINST WHICH CONCRETE IS POURED,

NAMELY, AS A SUBSTITUTE FOR BACK FORMS (WHICH WORK

IS PERFORMED BY PILEDRIVERS): $0.13 PER HOUR

CARPENTER: (2) MILLWRIGHT

FOOTNOTE: WORK OF

FORMING IN THE CONSTRUCTION OF OPEN CUT SEWERS OR

STORM DRAINS, ON OPERATIONS IN WHICH HORIZONTAL

LAGGING IS USED IN CONJUNCTION WITH STEEL H-BEAMS

DRIVEN OR PLACED IN PRE- DRILLED HOLES, FOR THAT

PORTION OF A LAGGED TRENCH AGAINST WHICH CONCRETE

The beginning of the document. Download the full file to read on.

Other documents in this bid