Attachment 6: DB Wage Determination (Mod 6)
Updated
A PDF document (232 KB) attached to Facility Readiness and Maintenance Execution (FRAME) Request for Proposal (RFP) - DRAFT, from the Department of the Air Force. Due Jan 31, 2027, 4:30 PM (UTC-8).
File name: Attch 6 DB WD CA20260018 (Mod 6).pdf
The full file is for paid members, or buy this bid alone.
Preview
"General Decision Number: CA20260018 07/14/2026
State: California
Construction Types: Building, Heavy and Highway
Counties: California Counties of
Alameda, Calaveras, Contra Costa,
Fresno, Kings, Madera, Mariposa, Merced,
Monterey, San Benito, San Francisco, San
Joaquin, San Mateo, Santa Clara, Santa
Cruz, Stanislaus and Tuolumne
Building Construction Projects
Dredging Projects-Includes Dredging Projects (does not include hopper dredge work) Heavy Construction Projects (excludes water well drilling) Highway Construction Projects
Modification Number
Publication Date
01/30/2026
05/18/2026
07/14/2026
ASBE0016-004 05/01/2025
Rates
ASBESTOS REMOVAL WORKER/HAZARDOUS MATERIAL HANDLER:
INCLUDES PREPARATION, WETTING, STRIPPING, REMOVAL,
SCRAPPING, VACUUMING, BAGGING AND DISPOSING OF ALL
INSULATION MATERIALS FROM MECHANICAL SYSTEMS,
WHETHER THEY CONTAIN ASBESTOS OR NOT (AREA 1:
CALAVERAS, FRESNO, KINGS, MADERA, MARIPOSA, MERCED,
MONTEREY, SAN BENITO, SAN JOAQUIN, SANTA CRUZ,
ASBESTOS REMOVAL WORKER/HAZARDOUS MATERIAL HANDLER:
INCLUDES PREPARATION, WETTING, STRIPPING, REMOVAL,
SCRAPPING, VACUUMING, BAGGING AND DISPOSING OF ALL
INSULATION MATERIALS FROM MECHANICAL SYSTEMS,
WHETHER THEY CONTAIN ASBESTOS OR NOT (AREA 2:
ALAMEDA, CONTRA COSTA, SAN FRANCISCO, SAN MATEO, &
---------------------------------------------------------------ASBE0016-008 01/01/2024
Rates
ASBESTOS WORKERS/INSULATOR: INCLUDES THE
APPLICATION OF ALL INSULATING MATERIALS, PROTECTIVE
COVERINGS, COATINGS, AND FINISHES TO ALL TYPES OF
MECHANICAL SYSTEMS (AREA 1: ALAMEDA, CONTRA COSTA,
MONTEREY, SAN BENITO, SAN FRANCISCO, SAN MATEO,
ASBESTOS WORKERS/INSULATOR: INCLUDES THE
APPLICATION OF ALL INSULATING MATERIALS, PROTECTIVE
COVERINGS, COATINGS, AND FINISHES TO ALL TYPES OF
MECHANICAL SYSTEMS (AREA 2: CALAVERAS, FRESNO,
KINGS, MADERA, MARIPOSA, MERCED, SAN JOAQUIN,
Fringes
11.40
12.75
Fringes
25.07
---------------------------------------------------------------BOIL0549-001 01/01/2021
Rates
BOILERMAKER (AREA 1: ALAMEDA, CONTRA COSTA, SAN
---------------------------------------------------------------BRCA0003-001 08/01/2024
Rates
---------------------------------------------------------------BRCA0003-003 08/01/2024
Rates
---------------------------------------------------------------BRCA0003-005 05/01/2024
Rates
BRICKLAYER ( 1) FRESNO, KINGS, MADERA, MARIPOSA,
BRICKLAYER ( 9) CALAVERAS, SAN JOAQUIN, STANISLAUS,
BRICKLAYER (8) ALAMEDA, CONTRA COSTA, SAN BENITO,
---------------------------------------------------------------BRCA0003-008 07/01/2024
The beginning of the document. Download the full file to read on.
Other documents in this bid
- Attachment 1: FRAME Performance Work Statement - draft
- Attachment 2: Apdx H Environmental Reqs - draft
- Attachment 2: Apdx J Antenna Tower Resp List draft
- Attachment 3: Consolidated DID Files draft
- Attachment 4: FRAME Incentive Plan - Draft
- Attachment 5: Appendix B Wage Rate Tables redacted
- Attachment 5: CBA IBEW 2024 12949 Appdx A redacted
- Attachment 6: DB Wage Determination (Mod 5)
- Attachment 8: Section L - draft
- Attachment 9: Section M - draft
- Request for Information Atch 1 Industry Day Agenda 22