Addendum 1 Summary of Changes and RFI Responses
Fort Bliss National Cemetery | Project 886CM3026
Civil and landscape
•
•
•
•
•
CB501 | RFIs G-1, G-2, G-4, G-6 and Q-5 — Questions addressed conflicting crypt cover, drainage, aisle fill, fabric and references. Responses require 4-inch sand, 11–12-inch general fill, 3-inch decomposed granite, no topsoil, 6-inch drain rock, general aisle fill and revised fabric details. Sheet updates details, references CB101–CB108 and adopts ACI 318-19. Sheet CB501 has been replaced in it’s entirety with CB501_ADD1.
CB502 | RFIs G-1, G-2, G-4, G-6 and G-7 — Questions addressed crypt layers, fabric and excavation through section breaks. Responses confirm the layers above and no excavation to continue drainage aggregate between burial sections. Revised transverse detail clarifies geotextile, perimeter crypts and general aisle fill; select-fill wording elsewhere remains to be reconciled. Sheet CB502 has been replaced in it’s entirety with CB502_ADD1.
CE121 | RFI K-1 — Asked whether decomposed granite/nonvegetative cover qualifies as final stabilization. Response: yes. Revised note requires uniform 3-inch cover, temporary BMP removal and sediment cleanup; seed/mulch/sod wording remains elsewhere. Sheet CE121 has been replaced in it’s entirety with CE121_ADD1.
LK111 | RFI Q-8 — Asked to correct the bid-option section-marker detail reference. Response: revise the callout. Keynote 6 now references Detail 3/LK501. Sheet LK111 has been replaced in it’s entirety with LK111_ADD1.
LP111 | RFI K-2 — Asked for seed mix and erosion-control blanket locations or deletion of the note. Response: no blanket is needed. Former Note 3 is deleted. Sheet LP111 has been replaced in it’s entirety with LP111_ADD1.
Architectural
•
•
•
•
2101-AD201 | RFI L-3 — Asked what the 2,500-SF stucco scope includes. Response includes exterior walls, chimneys, canopy sides and ramp/stair walls, with canopy ceiling retained. Sheet adds the quantity and included surfaces; “all sides” canopy wording needs coordination. Sheet 2101-AD201 has been replaced in it’s entirety with 2101-AD201_ADD1. 2101-AE101 | RFI L-2 and related O-8 — Asked which railing paint-removal method governs and who provides electrified hardware. Responses require chemical removal, specified coating testing and hardware responsibilities by set. FL22 is revised for chemical stripping/refinishing; FL8 says credential reader. No direct RFI for the FL8 terminology change was identified. Sheet 2101-AE101 has been
The beginning of the document. Download the full file to read on.
Other documents in this bid
- Fort Bliss Gravesite Expansion BD Part 1
- Fort Bliss Gravesite Expansion BD Part 10
- Fort Bliss Gravesite Expansion BD Part 11
- Fort Bliss Gravesite Expansion BD Part 2
- Fort Bliss Gravesite Expansion BD Part 3
- Fort Bliss Gravesite Expansion BD Part 4
- Fort Bliss Gravesite Expansion BD Part 5
- Fort Bliss Gravesite Expansion BD Part 6
- Fort Bliss Gravesite Expansion BD Part 7
- Fort Bliss Gravesite Expansion BD Part 8
- Fort Bliss Gravesite Expansion BD Part 9
- Fort Bliss Gravesite Expansion - Specifications Full Book