Kirtland Air Force Base
Installation Facilities Standards (IFS)
G26 Kirtland AFB IFS Electrical
Comply with Air Force Corporate Standards for Overview: http://afcfs.wbdg.org/index.html
Summary of Sections in this Supplemental Document:
26 05 13 Medium-Voltage Cables
26 05 19 Low-Voltage Electrical Power Conductors and Cables 26 05 26 Grounding and Bonding for Electrical Systems
26 10 00 Medium-Voltage Electrical Distribution
26 12 00 Medium-Voltage Transformers
26 13 00 Medium-Voltage Switchgear
26 20 00 Low-Voltage Electrical Distribution
26 32 00 Packaged Generator Assemblies
26 41 00 Facility Lightning Protection
26 51 00 Interior Lighting
26 56 00 Exterior Lighting
Appendix A: PMH Switches
Related Requirements Listed Elsewhere
21 00 00 Fire Suppression
23 00 00 Heating, Ventilating, and Air Conditioning (HVAC)
25 00 00 Integrated Automation
27 00 00 Communications
28 00 00 Electronic Safety and Security
33 00 00 Utilities
26 00 00 Electrical: General Requirements
1.
This document is provided as a supplement to the Kirtland AFB IFS. If there are any discrepancies between this Supplemental Document and the requirements of the IFS, the IFS will govern.
2.
This Supplemental Document supersedes all previous versions of design standards documents.
3.
Revision History:
Revision
Date
Change Summary
TBD
Initial submission
03Feb2023
Update POC’s, stringent regulations
24Oct2024
Update requirements
21Apr2025
Adopted IFS-UFGS Format:
G26 Kirtland AFB IFS Electrical
(Facility Electrical, Medium and Low Voltage)
G26 Kirtland AFB IFS Electrical
G33 Kirtland AFB IFS Utilities
(Electrical Distribution, Substations and Transformers, and High Voltage) 4.
Project specifications must reference all applicable Air Force Regulations and Standards (UFCs, AFIs, AFMANs). This includes projects managed by the US Army Corps of Engineers (USACE).
5.
New construction must meet or exceed all current UFC, AFI, AFMAN, NEC and NESC Codes.
6.
All construction submittals and design drawings must be routed through the CE Operations Engineering Office, 853-1817, and the CE Exterior Electric Shop, 846- 8145, for review & comment.
7.
Kirtland AFB has a “No Energized Work” policy. Contractors are responsible for installing safety grounds prior to working on the de-energized portions of Kirtland’s primary electrical distribution system. KAFB’s CE Exterior Electric Shop will perform all switching to de-energize these lines.
8.
10 business days at a minimum is needed to de-energize any portion of Kirtland’s primary
The beginning of the document. Download the full file to read on.
Other documents in this bid
- PDB Repair Substation 9 and Feeders - Scope of Services
- Attachment - Planning Charrette and Map Sub 9
- PDB Remove Sub23 & Connect Loads Sub24 Scope of Service
- Attachment - Line diagrams for Sub 23
- PDB Demo Sub3 and Rebuild Sub10 Scope of Services
- Attachmnet - Specifications Demo Sub3 - Rebuild Sub10
- Attachment Engineering and Construction Requirements
- Attachment Guidance for GIS Data and As-Builts