PDB Repair Substation 9 and Feeders - Scope of Services
Updated
A PDF document (226 KB) attached to Electrical Projects – Use of Progressive Design Build (PDB) with Other Transaction Authority (OTA) - Request for Information, from the Department of the Air Force. Due Nov 19, 2026, 4:30 PM (UTC-7).
File name: 01. PDB_MHMV200009_Repair Substation 9 and Feeders - Scope of Services_19Oct2026.pdf
The full file is for paid members, or buy this bid alone.
Preview
SCOPE OF SERVICES
Progressive Design-Build (PDB)
REPAIR SUBSTATION 9 AND FEEDERS
MHMV 200009
19 October 2026
KIRTLAND AIR FORCE BASE
NEW MEXICO
1.
2.
3.
4.
5.
6.
PURPOSE
DESCRIPTION OF NEED
COST MODELING
RISK MANAGEMENT
PROJECT SCHEDULE
ATTACHMENTS
Repair Substation 9 and Feeders
MHMV200009
Scope of Services
1. PURPOSE
The purpose of this Scope of Services is to provide a detailed project scope and technical requirements for Repair Substation 9 and Feeders located on Kirtland Air Force Base (KAFB). Offerors shall use the information contained herein as information for their qualifications package.
2. DESCRIPTION OF NEED
The Repair Substation 9 and Feeders project is required because the existing Substation 9 and both of its 12.47 kV feeders have reached the end of their operational lifespan, requiring replacement to ensure grid reliability. To resolve this infrastructure end lifespan, there is a requirement for the design and construction of a new substation facility. Additionally, because the existing assets must be fully retired, this requirement includes the complete demolition and removal of the existing substation, poles, hardware, and conductors to clear the site and bring the infrastructure up to current regulatory standards.
2.1. Project Goals
The primary objective of The Repair Substation 9 and Feeders project is to design and construct a fully operational, modern power distribution asset, upgrading the existing infrastructure to meet standards, enhance operational efficiency, and ensure compliance with regulatory guidelines. This goal will be achieved by establishing the new substation facility within a defined 100ft x 150ft footprint directly south of the existing location, and installing all-new substation components, security fencing, distribution poles, switching gear, and conductors. The project also aims to complete the systematic teardown and removal of all retired infrastructure to restore the original site.
Project to comply with all applicable federal, state, and local laws; statutes; Executive Orders; Department of Defense/Air Force manuals, handbooks, regulations, guidance, and policies. Project to comply with the Whole Building Design Guide (WBDG), Unified Facility Criteria (UFC), and all related libraries. The primary criteria are the Air Force Criteria from the Documents Library. The Unified Facilities Guide Specifications (UFGS) is the mandatory starting point for all specifications, and shall not be deleted, materially modified, or made
The beginning of the document. Download the full file to read on.
Other documents in this bid
- Attachment - Planning Charrette and Map Sub 9
- PDB Remove Sub23 & Connect Loads Sub24 Scope of Service
- Attachment - Line diagrams for Sub 23
- PDB Demo Sub3 and Rebuild Sub10 Scope of Services
- Attachmnet - Specifications Demo Sub3 - Rebuild Sub10
- Attachment Engineering and Construction Requirements
- Attachment KAFB Low and Medium-Voltage Electrical Design and Equipment Requirements
- Attachment Guidance for GIS Data and As-Builts