(B) B434 Statement of Work Specifications
Updated
A PDF document (12.0 MB) attached to Building 434 Roof Repair, from the Department of the Navy. Due Dec 21, 2026, 2:00 PM (UTC-5).
File name: (B) B434 SOW_Specs.pdf
The full file is for paid members, or buy this bid alone.
Preview
TASK ORDER NO. N4008526D0572
SPECIFICATIONS
FINAL SUBMISSION JUNE 2026
Building 430 and Building 434 Roof Replacement
At
Naval Submarine Base New London, Groton, CT
SUBMITTED BY:
Colby Company Engineering
47A York Street
Portland, ME 04101
A/E Contract Number: N40085-24-D-0047
PREPARED BY:
Architectural: Dan Ellingson, R.A., Colby Company Engineering Structural: Josiah Purin, P.E., Colby Company Engineering
APPROVED BY:
For Commander, NAVFAC Mid-Atlantic
Scot Deledda
B430 AND B434 ROOF REPLACEMENT
NAVAL SUBMARINE BASE NEW LONDON
100% FINAL SUBMISSION
JUNE 2026
PROJECT TABLE OF CONTENTS
DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS
00 01 15
LIST OF DRAWINGS
DIVISION 01 - GENERAL REQUIREMENTS
01 11 00
01 14 00
01 20 00
01 30 00
01 31 23.13 20
02/24, CHG 1: 05/25
11/22, CHG 5: 05/25
11/20, CHG 5: 02/25
11/20, CHG 5: 02/25
08/23, CHG 1: 02/24
01 32 17.00 20
01 33 00
01 35 26
01 42 00
01 45 00
01 50 00
08/18, CHG 4: 02/21
05/24, CHG 1: 05/25
08/23, CHG 3: 08/25
11/20, CHG 3: 08/24
01 57 19
01 74 19
08/22, CHG 2: 08/25
02/19, CHG 3: 11/21
01 78 00
01 78 23
01 78 24.00 20
05/19, CHG 1: 08/21
05/23, CHG 2: 11/25
05/23, CHG 1: 11/23
SUMMARY OF WORK
WORK RESTRICTIONS
PRICE AND PAYMENT PROCEDURES
ADMINISTRATIVE REQUIREMENTS
ELECTRONIC CONSTRUCTION AND FACILITY
SUPPORT CONTRACT MANAGEMENT SYSTEM
(eCMS)
COST-LOADED NETWORK ANALYSIS SCHEDULES
(NAS)
SUBMITTAL PROCEDURES
GOVERNMENTAL SAFETY REQUIREMENTS
SOURCES FOR REFERENCE PUBLICATIONS
QUALITY CONTROL
TEMPORARY CONSTRUCTION FACILITIES AND
CONTROLS
TEMPORARY ENVIRONMENTAL CONTROLS
CONSTRUCTION WASTE MANAGEMENT AND
DISPOSAL
CLOSEOUT SUBMITTALS
OPERATION AND MAINTENANCE DATA
FACILITY DATA WORKBOOK (FDW)
DIVISION 02 - EXISTING CONDITIONS
02 41 00
02 82 00
02 83 00
02 84 33
DEMOLITION
ASBESTOS REMEDIATION
LEAD REMEDIATION
REMOVAL AND DISPOSAL OF
POLYCHLORINATED BIPHENYLS (PCBs)
DIVISION 05 - METALS
05 05 23.16
05 12 00
STRUCTURAL WELDING
08/18, CHG 2: 05/21 STRUCTURAL STEEL
DIVISION 06 - WOOD, PLASTICS, AND COMPOSITES
06 10 00
08/16, CHG 3: 05/25 ROUGH CARPENTRY
DIVISION 07 - THERMAL AND MOISTURE PROTECTION
07 22 00
07 53 23
07 60 00
07 84 00
07 92 00
ROOF AND DECK INSULATION
ETHYLENE-PROPYLENE-DIENE-MONOMER
ROOFING
08/23, CHG 1: 05/25 FLASHING AND SHEET METAL
05/10, CHG 1: 08/13 FIRESTOPPING
JOINT SEALANTS
DIVISION 26 - ELECTRICAL
26 20 00
05/25, CHG 2: 02/26 INTERIOR DISTRIBUTION SYSTEM
PROJECT TABLE OF CONTENTS Page 1
B430 AND B434 ROOF REPLACEMENT
NAVAL SUBMARINE BASE NEW LONDON
26 41 00
100% FINAL SUBMISSION
JUNE 2026
LIGHTNING PROTECTION SYSTEM
-- End of Project Table of Contents --
The beginning of the document. Download the full file to read on.