Home / Building 434 Roof Repair / Document

(J) Request for Information Form

Updated

A PDF document (435 KB) attached to Building 434 Roof Repair, from the Department of the Navy. Due Dec 21, 2026, 2:00 PM (UTC-5).

File name: (J) RFI Form.pdf

Download the full documentSee the bid

The full file is for paid members, or buy this bid alone.

Preview

RFP NUMBER:

REQUEST FOR INFORMATION

RFI NUMBER:

N40085-26-RFPRFQ-NEW-LONDON-ROICC-0049

CONTRACT TITLE: B434 Roof Replacement

PRIME CONTRACTOR:

SUBCONTRACTOR/SUPPLIER:

SUBJECT/TITLE OF RFI:

DRAWING(S):

DETAIL(S):

SPECIFICATION:

COST EFFECT:

INCREASE:

DECREASE:

INFORMATION REQUESTED & RECOMMENDED SOLUTION:

Date Response Required By:

CPM ACTIVITY NUMBER:

NONE:

Date:

Signature:

Date:

Signature:

From:
To: Field Office
Code

RECOMMENDATION:

From: Field Office
To: Prime Contractor

REPLY:

Date:
Signature:
This reply is given with the expressed understanding that it does not constitute basis for change in the amount or time of subject contract. If you do not concur, DO NOT PROCEED, and notify this office immediately. Please assign PC #
to this change. It is requested that a proposal be forwarded by

. THIS DOES NOT

CONSTITUTE AUTHORIZATION TO PROCEED.
─────────────────────────────────────────────────────────────────────── ───────────────────
copy to:
File 2L
Supv Civil Engineer
Construction Representative

The RFI system is intended to provide an efficient mechanism for responding to contractor’s request for information ONLY. This system DOES NOT authorize the contractor to proceed with work - to do so, the contractor proceeds at his own risk. If the contractor considers the RFI response a changed condition, written notice to the Contracting Officer is required within 20 calendar days. DISTRIBUTION: Original to File via REICC

PL/DM

ET

A/E

PC #

via AROICC/CONTRACT OFFICER

The beginning of the document. Download the full file to read on.

Other documents in this bid