(I) General Requirements
Updated
A PDF document (283 KB) attached to Building 434 Roof Repair, from the Department of the Navy. Due Dec 21, 2026, 2:00 PM (UTC-5).
File name: (I) General Requirements.pdf
The full file is for paid members, or buy this bid alone.
Preview
General Contract Requirements for Naval Submarine Base New London, Groton CT. Update: 9/6/18
a. Station Regulations: The Contractor and his employees shall become acquainted with and obey all Government regulations as posted, or as requested by the Contracting Officer. b. Fire Protection: The Contractor and his employees shall know where fire alarms are located and how to turn them on. The Contractor shall handle and store all combustible supplies, materials, waste and trash in a manner that prevents fire or hazards to persons, facilities, and materials. Contractor employees operating critical equipment shall be trained to properly respond during a fire alarm or fire per SUBASENLON Instruction number 11320.9C, SUBASE FIRE REGULATIONS. c. Safety Requirements and Reports
(1) Prior to commencing work, the Contractor shall meet with the Contracting Officer’s representatives to discuss and develop mutual understandings relative to the administration of the Safety Program.
(2) The Contractor’s equipment may be inspected periodically for OSHA and/or Navy violations. The correction of any violations will be the responsibility of the Contractor. The Contractor shall provide assistance to the Safety Inspectors and/or any Federal or State OSHA Inspectors id a complaint is filed. Any fines levied on the Contractor by the Federal or State OSHA offices due to any safety/health violations resulting from any contract action must be paid promptly. (3) The contractor shall submit to the Contracting Officer, a full report of damage to Government property or equipment by Contractor employees. All damage reports shall be submitted to the Contracting Officer within 24 hours of occurrence.
(4) The Contractor shall report to the Contracting Officer, all accidents resulting in death, trauma, or occupational disease. All accidents must be reported to the Contracting Officer within 24 hours of occurrence.
(5) All work performed under this contract shall be performed in accordance with the guidelines provided by the latest version of the US Army Corps of Engineers Safety Manual, COE EM-385. (6) The contractor shall be aware that “NO EMERGENCY MEDICAL SERVICES ARE
AVAILABLE AT THE NAVAL SUBMARINE BASE OR THE NAVAL AMBULATORY
CARE CENTER LOCATED ON THE BASE.”
(7) Crane Safety: In addition to the requirements of the Corps of Engineers Safety Manual, EM-385-1-1, the Contractor shall comply with the requirements of NAVFAC, P-307,
MANAGEMENT OF WEIGHT HANDLING EQUIPMENT (WHE) as follows:
The beginning of the document. Download the full file to read on.