Home / Building 434 Roof Repair / Document

(N) Drawings B434 Roof

Updated

A PDF document (5.4 MB) attached to Building 434 Roof Repair, from the Department of the Navy. Due Dec 21, 2026, 2:00 PM (UTC-5).

File name: (N) Drawings B434 Roof.pdf

Download the full documentSee the bid

The full file is for paid members, or buy this bid alone.

Preview

6/25/2026

DATE

ISSUED FOR CONSTRUCTION

DESCRIPTION

NAVAL STATION NEW LONDON

D

MARK

ROOF REPLACEMENT

EPROJECT NO. 1741871

TASK ORDER NO. N40085-26-F-0572

NP

gPCOEM4,%

gar

I-BUILDING 434

BENJAMIN C.

TOWNSEND

No. 87

♦

rid

ft

e--. Bi

l

U
d

t-

ME

A

o CONCORD

NYC

Fas

-

L

r

LAND

LONG IS

#

J.

— r.7T

N.J.

s

INDICATES DIRECTION

OF CUTTING PLANE

a" l

NJ

I

I

N

-semi iin
- “■ mea

C-102

-9‘.. ght

e.

he

SECTION

DETAIL LETTER OR NUMBER

L-

SHEET NUMBER WHERE

DETAIL IS REFERENCED

A
A-000

eats"
A

APPROVED BY WILLIAM DAME

VIA EMAIL

DRE

C-102

DETAIL

NTS

A

NAVFAC Drawing Number

DRAWING TITLE

G-001

12949375

COVER SHEET

G-101

12949376

B.434 SITE ACCESS AND LAYDOWN PLAN

A-001

12949377

GENERAL NOTES, ABBREVIATIONS, AND LEGEND

AD101

12949378

B.434 DEMOLITION ROOF PLAN

A-101

12949379

B.434 ROOF PLAN

A-501

12949380

ROOF DETAILS

A-502

12949381

ROOF DETAILS

A-503

12949382

DEPARTMENT OF THE NAVY

LIST OF DRAWINGS

SHEET NO.

B

A

1741871

CONSTR. CONTR. NO.

N40085-X-XXXX

QUALITY CONTROL REVIEW

ROOF DETAILS AND SECTIONS

-----

AS NOTED

SCALE:

NAVFAC DRAWING NO.

12949375
Date

Signature

EAC
KWA
SED

EPROJECT NO.:

SHEET

CHK

BRANCH MANAGER

VICINITY MAP

SHEET

RMK

DRW

PM/DM

s

NTS

06/24/2026

DATE

FIRE PROTECTION

h
-

ACTIVITY

CHIEF ENG/ARCH

ADDITIONAL SHEET

REFERENCES

N

SHEET NUMBER WHERE

SECTION IS REFERENCED

A
A-000

’ ha

SsT

SECTION LETTER OR NUMBER

SATISFACTORY TO

ADDITIONAL SHEET

REFERENCES

«r

A

Scot Deledda

OF

G-001

DRAWFORM REVISION: 14 SEP 2023

DES

CAMPUS

BUILDING

MAP

a

BLOCK

ISLAND

ELEVATION

COVER SHEET

D

ISLAN

LONG

ga
. • ■ -= ast et“I ed

.-A

SULOP

D

SOUN

A/E INFO

APPROVED BY WILLIAM DAME VIA EMAIL

BUILDING 434 ROOF REPLACEMENT

B

C-102

GROTON, CT

(h

s92

FOR COMMANDER NAVFAC

mn
feg

os’
IhW nrv

RI

NY

I

‘3 :

PROVIDENCE

o

w*

r

CT

e.m h.

l

—T

BOSTON

ass

ADDITIONAL SHEET

REFERENCES

ering &

NAVAL SUBMARINE BASE NEW LONDON

MA

f

—4

SHEET NUMBER WHERE

ELEVATION IS REFERENCED

A
A-000

SEAL

LCCE,
Dgey
O

SUBASE NEW LONDON GROTON, CT

CONNECTICU

ER

ON RIV

HUDS

HARTFORDO'

#4

i

8/13/2026 10:52:42 AM

X:\297 PORTSMOUTH NAVAL SHIPYARD\297.313.001 - GROTON B. 430 & B. 434 ROOF REPLACEMENT\DRAWINGS\SHEETS\B.434\G-001.DWG

T RIVER

X-

A

ga

ELEVATION LETTER OR NUMBER

PWD FEAD NEW LONDON

BRATTLEBORO

O

i

J.

INDICATES DIRECTION

OF CUTTING PLANE

NAVAL FACILITIES ENGINEERING SYSTEMS COMMAND ~ MID-ATLANTIC

NH

T "d

06/25/26

NAVAL FACILITIES ENGINEERING COMMAND

VT

7et/.

ELEVATION, SECTION OR DETAIL SYMBOLS

e

30 fA.‘y

eg

J

I

i

t

k*

c

VI

C

MMMLK

%

e

PORTLANDOv

♦

i

V

C

D

6/25/2026

DATE

■

NOTES:

THE ANTICIPATED AVAILABLE CONTRACTOR PARKING AND

LAYDOWN AREA IS IDENTIFIED. THE EXACT LOCATION WILL BE

CONFIRMED AT THE PRE-CONSTRUCTION MEETING.

2.

NOTE LAYDOWN AREA IS AN ACCEPTABLE LOCATION FOR

SCAFFOLD TOWER IF KTR DESIRES.

The beginning of the document. Download the full file to read on.

Other documents in this bid