(D) ECMS
Updated
A PDF document (80 KB) attached to Building 434 Roof Repair, from the Department of the Navy. Due Dec 21, 2026, 2:00 PM (UTC-5).
File name: (D) ECMS.pdf
The full file is for paid members, or buy this bid alone.
Preview
SECTION TABLE OF CONTENTS DIVISION
01 - GENERAL REQUIREMENTS SECTION
01 31 23.13 20
ELECTRONIC CONSTRUCTION AND FACILITY SUPPORT CONTRACT MANAGEMENT SYSTEM
PART 1
GENERAL
1.1
CONTRACT ADMINISTRATION
1.2
USER PRIVILEGES
1.3
SUBMITTALS
1.4
SYSTEM REQUIREMENTS AND CONNECTIVITY
1.4.1
General
1.4.2
Contractor Personnel List
1.4.3
Field Administration
1.5
SECURITY CLASSIFICATION
1.6
ECMS UTILIZATION
1.6.1
Information Security Classification/Identification
1.6.2 Markings on FOUO documents
PART 2
PRODUCTS
PART 3
EXECUTION
-- End of Section Table of Contents --
SECTION 01 31 23.13 20
SECTION 01 31 23.13 20
ELECTRONIC CONSTRUCTION AND FACILITY SUPPORT CONTRACT MANAGEMENT SYSTEM
PART 1
1.1
GENERAL
CONTRACT ADMINISTRATION
Utilize the Naval Facilities Engineering Command's (NAVFAC's) Electronic Construction and Facility Support Contract Management System (eCMS) for the transfer, sharing and management of electronic technical submittals and documents.
The web-based eCMS is the designated means of
transferring technical documents between the Contractor and the Government. Paper media or e-mail submission, including originals or copies, of the documents identified in Table 1 are not permitted, except where eCMS is unavailable or non-functional.
Contact
the Contracting Officer's Representative (COR) regarding availability of eCMS training and reference materials.
1.2
USER PRIVILEGES
The Contractor will be provided access to eCMS. All technical submittals and documents must be transmitted to the Government via the COR.
Project roles and
system roles will be established to control each user's menu, application, and software privileges, including the ability to create, edit, or delete objects.
1.3
SUBMITTALS
Government approval is required for submittals with a "G" designation; submittals not having a "G" designation are for Contractor Quality Control approval. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government.] Submittals with an "S" are for inclusion in the
Sustainability eNotebook, in conformance with Section 01 33 29 SUSTAINABILITY REPORTING. Submit the following in accordance with Section
01 33 00 SUBMITTAL PROCEDURES:
SD-01 Preconstruction Submittals
List of Contractor's Personnel; G
1.4
1.4.1
SYSTEM REQUIREMENTS AND CONNECTIVITY
General
The eCMS requires a web-browser (platform-neutral) and Internet connection.
Obtain from an approved vendor an External Certification
The beginning of the document. Download the full file to read on.