A PDF document (34 KB) attached to WWYK250063 - Install React VII Facility, B9001, Post V19, from the Department of the Air Force. Due Nov 2, 2026, 2:00 PM (UTC-6).
File name: 05 05 23.16.pdf
The full file is for paid members, or buy this bid alone.
Preview
Tinker AFB, OK
TAFB Technical Sprcifications 2019
SECTION 05 05 23.16
STRUCTURAL WELDING
PART 1
1.1
GENERAL
REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.
AMERICAN INSTITUTE OF STEEL CONSTRUCTION (AISC)
AISC 360
(2010) Specification for Structural Steel
Buildings
AMERICAN SOCIETY FOR NONDESTRUCTIVE TESTING (ASNT)
ANSI/ASNT CP-189
(2011) ASNT Standard for Qualification and
Certification of Nondestructive Testing
Personnel (ANSI/ASNT CP-105-2006)
AMERICAN WELDING SOCIETY (AWS)
AWS A2.4
(2012) Standard Symbols for Welding,
Brazing and Nondestructive Examination
AWS D1.1/D1.1M
(2015; Errata 2015) Structural Welding
Code - Steel
AWS D1.3/D1.3M
(2008; Errata 2008) Structural Welding
Code - Sheet Steel
AWS D1.4/D1.4M
(2011) Structural Welding Code Reinforcing Steel
AWS D1.8/D1.8M
(2009) Structural Welding Code—Seismic
Supplement
AWS D14.4/D14.4M
(2012) Specification for Welded Joints for
Machinery and Equipment
AWS Z49.1
(2012) Safety in Welding and Cutting and
Allied Processes
ASTM INTERNATIONAL (ASTM)
ASTM E165/E165M
(2012) Standard Practice for Liquid
Penetrant Examination for General Industry
ASTM E709
(2015) Standard Guide for Magnetic
Particle Examination
April 2019
SECTION 05 05 23.16
Tinker AFB, OK
1.2
TAFB Technical Sprcifications 2019
SUBMITTALS
Government approval is required for submittals with a "G" designation; submittals not having a "G" designation are for Contractor Quality Control approval. Submit the following in accordance with Section 01 33 00
SUBMITTAL PROCEDURES:
SD-01 Preconstruction Submittals
Welding Quality Assurance Plan
SD-03 Product Data
Welding Procedure Qualifications; G
Welder, Welding Operator, and Tacker Qualification
Inspector Qualification
Previous Qualifications
Pre-Qualified Procedures
Welding Electrodes and Rods
SD-06 Test Reports
Nondestructive Testing
SD-07 Certificates
Certified Welding Procedure Specifications (WPS)
Certified Brazing Procedure Specifications (BPS)
Certified Procedure Qualification Records (PQR)
Certified Welder Performance Qualifications (WPQ)
Certified Brazer Performance Qualifications (BPQ)
1.3
QUALITY ASSURANCE
Except for pre-qualified (in accordance with AWS D1.1/D1.1M) and previously qualified procedures, each Contractor performing welding must record in detail and qualify the welding procedure specification for any