Home / WWYK250063 - Install React VII Facility, B9001, Post V19 / Document

Bid document

Updated

A PDF document (25 KB) attached to WWYK250063 - Install React VII Facility, B9001, Post V19, from the Department of the Air Force. Due Nov 2, 2026, 2:00 PM (UTC-6).

File name: 23 03 00.pdf

Download the full documentSee the bid

The full file is for paid members, or buy this bid alone.

Preview

Tinker AFB, OK

TAFB Technical Specifications 2019

SECTION 23 03 00

BASIC MECHANICAL MATERIALS AND METHODS

PART 1

1.1

GENERAL

REFERENCES

The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only. Unless specifically noted, the current edition of the reference shall be used.

ASTM INTERNATIONAL (ASTM)

ASTM B117

Standard Practice for Operating Salt Spray
(Fog) Apparatus

INSTITUTE OF ELECTRICAL AND ELECTRONICS ENGINEERS (IEEE)

IEEE C2

National Electrical Safety Code

NATIONAL ELECTRICAL MANUFACTURERS ASSOCIATION (NEMA)

NEMA MG 1

Motors and Generators

NEMA MG 10

Energy Management Guide for Selection and Use
of Fixed Frequency Medium AC Squirrel-Cage
Polyphase Induction Motors

NEMA MG 11

Energy Management Guide for Selection and Use
of Single Phase Motors

NATIONAL FIRE PROTECTION ASSOCIATION (NFPA)

NFPA 70

1.2

National Electrical Code

SUBMITTALS

Government approval is required for all submittals. The following shall be submitted in accordance with Section 01 33 00 SUBMITTAL PROCEDURES: SD-03 Product Data
Certification
1.3

RELATED REQUIREMENTS

This section applies to all sections of Divisions: 21, FIRE SUPPRESSION; 22,

PLUMBING; and 23, HEATING, VENTILATING, AND AIR CONDITIONING of this

project specification, unless specified otherwise in the individual section.

April 2019

Section 23 03 00

Tinker AFB, OK

1.4

TAFB Technical Specifications 2019

QUALITY ASSURANCE

1.4.1

Material and Equipment Qualifications

Provide materials and equipment that are standard products of manufacturers regularly engaged in the manufacture of such products, which are of a similar material, design and workmanship. Standard products shall have been in satisfactory commercial or industrial use for 2 years prior to bid opening. The 2-year use shall include applications of equipment and materials under similar circumstances and of similar size. The product shall have been for sale on the commercial market through advertisements, manufacturers' catalogs, or brochures during the 2 year period. 1.4.2

Alternative Qualifications

Products having less than a two-year field service record will be acceptable if a certified record of satisfactory field operation for not less than 6000 hours, exclusive of the manufacturer's factory or laboratory tests, can be shown.
1.4.3

Service Support

The equipment items shall be supported by service organizations. Submit a certified list of qualified permanent service organizations for support of

The beginning of the document. Download the full file to read on.

Other documents in this bid