SECTION 01 45 00.00 10

QUALITY CONTROL

PART 1

1.1

GENERAL

REFERENCES

The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.

U.S. ARMY CORPS OF ENGINEERS (USACE)

EM 385-1-1

(2014) Safety -- Safety and Health
Requirements Manual

ER 1110-1-12

(2006; Change 1) Engineering and Design -Quality Management

1.2

SUBMITTALS

Government approval is required for submittals with a "G" designation; submittals not having a "G" designation are for Contractor Quality Control approval. Submit the following in accordance with Section 01 33 00

SUBMITTAL PROCEDURES:

SD-01 Preconstruction Submittals
Quality Control (QC) Plan; G
Additional Requirements for Design Quality Control (DQC) Plan; G SD-05 Design Data
Discipline-Specific Checklists
Design Quality Control
SD-06 Test Reports
QC Documentation

PART 2

PRODUCTS

Not Used

PART 3

3.1

EXECUTION

GENERAL REQUIREMENTS

Establish and maintain an effective quality control (QC) system that complies with FAR 52.246-12 Inspection of Construction. QC consist of plans, procedures, and organization necessary to produce an end product which complies with the Contract requirements. The QC system covers all design and/or construction operations, both onsite and offsite, and be January 2022

Section 01 45 00.00 10

Tinker AFB

Tinker General Requirements

keyed to the proposed design and/or construction sequence. The QC Manager, Project Manager, Design Quality Manager and Project Superintendent must work together effectively. Although the QC Manager is the primary individual responsible for quality control, all individuals will be held responsible for the quality of work on the job. 3.2

QUALITY CONTROL (QC) PLAN

Submit no later than 15 days after receipt of notice to proceed, the Quality Control (QC) Plan proposed to implement the requirements FAR 52.246-12 Inspection of Construction. Design and/or construction will be permitted to begin only after acceptance of the QC Plan. 3.2.1

Content of the QC Plan

Include, as a minimum, the following to cover all design and/or construction-operations, both onsite and offsite, including work by subcontractors, designers of record, consultants, architect/engineers (AE), fabricators, suppliers and purchasing agents:
a.

A description of the quality control organization, including a chart showing lines of authority and acknowledgment that the QC staff will implement the three phase control system for all aspects of the work