Bid document
Updated
A PDF document (36 KB) attached to WWYK250063 - Install React VII Facility, B9001, Post V19, from the Department of the Air Force. Due Nov 2, 2026, 2:00 PM (UTC-6).
File name: 01 45 00.00 10.pdf
The full file is for paid members, or buy this bid alone.
Preview
Tinker AFB
Tinker General Requirements
SECTION 01 45 00.00 10
QUALITY CONTROL
PART 1
1.1
GENERAL
REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.
U.S. ARMY CORPS OF ENGINEERS (USACE)
EM 385-1-1
(2014) Safety -- Safety and Health
Requirements Manual
ER 1110-1-12
(2006; Change 1) Engineering and Design -Quality Management
1.2
SUBMITTALS
Government approval is required for submittals with a "G" designation; submittals not having a "G" designation are for Contractor Quality Control approval. Submit the following in accordance with Section 01 33 00
SUBMITTAL PROCEDURES:
SD-01 Preconstruction Submittals
Quality Control (QC) Plan; G
Additional Requirements for Design Quality Control (DQC) Plan; G SD-05 Design Data
Discipline-Specific Checklists
Design Quality Control
SD-06 Test Reports
QC Documentation
PART 2
PRODUCTS
Not Used
PART 3
3.1
EXECUTION
GENERAL REQUIREMENTS
Establish and maintain an effective quality control (QC) system that complies with FAR 52.246-12 Inspection of Construction. QC consist of plans, procedures, and organization necessary to produce an end product which complies with the Contract requirements. The QC system covers all design and/or construction operations, both onsite and offsite, and be January 2022
Section 01 45 00.00 10
Tinker AFB
Tinker General Requirements
keyed to the proposed design and/or construction sequence. The QC Manager, Project Manager, Design Quality Manager and Project Superintendent must work together effectively. Although the QC Manager is the primary individual responsible for quality control, all individuals will be held responsible for the quality of work on the job. 3.2
QUALITY CONTROL (QC) PLAN
Submit no later than 15 days after receipt of notice to proceed, the Quality Control (QC) Plan proposed to implement the requirements FAR 52.246-12 Inspection of Construction. Design and/or construction will be permitted to begin only after acceptance of the QC Plan. 3.2.1
Content of the QC Plan
Include, as a minimum, the following to cover all design and/or construction-operations, both onsite and offsite, including work by subcontractors, designers of record, consultants, architect/engineers (AE), fabricators, suppliers and purchasing agents:
a.
A description of the quality control organization, including a chart showing lines of authority and acknowledgment that the QC staff will implement the three phase control system for all aspects of the work
The beginning of the document. Download the full file to read on.