Home / WWYK250063 - Install React VII Facility, B9001, Post V19 / Document

Bid document

Updated

A PDF document (171 KB) attached to WWYK250063 - Install React VII Facility, B9001, Post V19, from the Department of the Air Force. Due Nov 2, 2026, 2:00 PM (UTC-6).

File name: 23 09 13.pdf

Download the full documentSee the bid

The full file is for paid members, or buy this bid alone.

Preview

WWYK250063

INSTALL REACT VII FACILITY, B9001

SECTION 23 09 13

INSTRUMENTATION AND CONTROL DEVICES FOR HVAC

11/15, CHG 2: 05/21

PART 1

1.1

GENERAL

SUMMARY

This section provides for the instrumentation control system components excluding direct digital controllers, network controllers, gateways etc. that are necessary for a completely functional automatic control system. When combined with a Direct Digital Control (DDC) system, the Instrumentation and Control Devices covered under this section must be a complete system suitable for the control of the heating, ventilating and air conditioning (HVAC) and other building-level systems as specified and indicated.
a.

Install hardware to perform the control sequences as specified and indicated and to provide control of the equipment as specified and indicated.

b.

Install hardware such that individual control equipment can be replaced by similar control equipment from other equipment manufacturers with no loss of system functionality.

c.

Install and configure hardware such that the Government or their agents are able to perform repair, replacement, and upgrades of individual hardware without further interaction with the installing Contractor.

1.1.1

Verification of Dimensions

After becoming familiar with all details of the work, verify all dimensions in the field, and advise the Contracting Officer of any discrepancy before performing any work.
1.1.2

Drawings

The Government will not indicate all offsets, fittings, and accessories that may be required on the drawings. Carefully investigate the mechanical, electrical, and finish conditions that could affect the work to be performed, arrange such work accordingly, and provide all work necessary to meet such conditions.
1.2

RELATED SECTIONS

Related work specified elsewhere.

Section 23 30 00 HVAC AIR DISTRIBUTION

Section 23 05 15 COMMON PIPING FOR HVAC

Section 23 09 00 INSTRUMENTATION AND CONTROL FOR HVAC

Section 26 20 00 INTERIOR DISTRIBUTION SYSTEM

SECTION 23 09 13

WWYK250063

INSTALL REACT VII FACILITY, B9001

1.3

REFERENCES

The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.

AIR MOVEMENT AND CONTROL ASSOCIATION INTERNATIONAL, INC. (AMCA)

AMCA 500-D

(2018) Laboratory Methods of Testing
Dampers for Rating

AMCA 511

(2010; R 2016) Certified Ratings Program
for Air Control Devices

AMERICAN SOCIETY OF MECHANICAL ENGINEERS (ASME)

ASME B16.15

(2018) Cast Copper Alloy Threaded Fittings
Classes 125 and 250

The beginning of the document. Download the full file to read on.

Other documents in this bid