Home / WWYK250063 - Install React VII Facility, B9001, Post V19 / Document

Bid document

Updated

A PDF document (22 KB) attached to WWYK250063 - Install React VII Facility, B9001, Post V19, from the Department of the Air Force. Due Nov 2, 2026, 2:00 PM (UTC-6).

File name: 10 22 13.pdf

Download the full documentSee the bid

The full file is for paid members, or buy this bid alone.

Preview

Tinker AFB, OK

TAFB Technical Sprcifications 2019

SECTION 10 22 13

WIRE MESH PARTITIONS

PART 1

1.1

GENERAL

REFERENCES

The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.

AMERICAN IRON AND STEEL INSTITUTE (AISI)

AISI SG03-3

(2002; Suppl 2001-2004; R 2008)
Cold-Formed Steel Design Manual Set

ASTM INTERNATIONAL (ASTM)

ASTM A36/A36M

1.2

(2014) Standard Specification for Carbon
Structural Steel

SUBMITTALS

Government approval is required for submittals with a "G" designation; submittals not having a "G" designation are for Contractor Quality Control approval. Submit the following in accordance with Section 01 33 00

SUBMITTAL PROCEDURES:

SD-02 Shop Drawings
Wire Mesh Partitions
Show layout, details, materials, dimensions, finishes, and all information necessary for fabrication and installation. SD-03 Product Data
Wire Mesh Partitions
Submit for each type of partition, door, and window.
1.3

DELIVERY, STORAGE, AND HANDLING

Deliver materials in manufacturer's original, unopened containers or packaging with labels intact and legible. Deliver, store, and handle materials so as to prevent damage. Replace damaged or defective materials with new.
1.4

DESCRIPTION OF WORK

Wire mesh partitions must be all wire type or sheet metal base type, normal duty for normal industrial use, heavy duty for extra heavy industrial use. Provide partitions complete with fasteners, capping bars, adjustable floor sockets, bracing, doors, hardware, and other items necessary for a complete, useable, and rigid installation.

April 2019

SECTION 10 22 13

Tinker AFB, OK

PART 2

2.1

TAFB Technical Sprcifications 2019

PRODUCTS

PRODUCT SUSTAINABILITY CRITERIA

For products in this section, where applicable and to extent allowed by performance criteria, provide and document the following: 2.2

MATERIALS

Metal post and framing materials listed below must contain a minimum of 15 percent post-consumer recycled content and wire materials must contain a minimum of 50 percent post-industrial recycled content. Provide data identifying percentage of recycled content for metal post and framing materials. Also provide data identifying percentage of recycled content for wire materials.
2.2.1

Steel Shapes, Plates, and Bars

ASTM A36/A36M.
2.2.2

Cold-Formed Steel

AISI SG03-3.
2.2.3

Wire Mesh

Carbon steel wire, woven diamond mesh, intermediate crimped. 2.2.4

Floor Sockets

Cast or forged steel or ductile iron, adjustable, approximately 2-1/2

The beginning of the document. Download the full file to read on.

Other documents in this bid