Bid document
Updated
A PDF document (57 KB) attached to WWYK250063 - Install React VII Facility, B9001, Post V19, from the Department of the Air Force. Due Nov 2, 2026, 2:00 PM (UTC-6).
File name: 06 41 16.00 10.pdf
The full file is for paid members, or buy this bid alone.
Preview
Tinker AFB, OK
TAFB Technical Sprcifications 2019
SECTION 06 41 16.00 10
PLASTIC-LAMINATE-CLAD ARCHITECTURAL CABINETS
PART 1
1.1
GENERAL
REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.
AMERICAN NATIONAL STANDARDS INSTITUTE (ANSI)
ANSI A161.2
(1998) Decorative Laminate Countertops,
Performance Standards for Fabricated High
Pressure
ARCHITECTURAL WOODWORK INSTITUTE (AWI)
AWI AWS
(2nd Edition) Architectural Woodwork
Standards
ASTM INTERNATIONAL (ASTM)
ASTM D1037
(2012) Evaluating Properties of Wood-Base
Fiber and Particle Panel Materials
ASTM E84
(2016) Standard Test Method for Surface
Burning Characteristics of Building
Materials
ASTM F547
(2006; R 2012) Nails for Use with Wood and
Wood-Base Materials
BUILDERS HARDWARE MANUFACTURERS ASSOCIATION (BHMA)
ANSI/BHMA A156.9
(2015) Cabinet Hardware
COMPOSITE PANEL ASSOCIATION (CPA)
CPA A208.1
(2016) Particleboard
CPA A208.2
(2016) Medium Density Fiberboard (MDF) for
Interior Applications
NATIONAL ELECTRICAL MANUFACTURERS ASSOCIATION (NEMA)
ANSI/NEMA LD 3
(2005) Standard for High-Pressure
Decorative Laminates
SCIENTIFIC CERTIFICATION SYSTEMS (SCS)
SCS
April 2019
SCS Global Services (SCS)Indoor Advantage
SECTION 06 41 16.00 10
Tinker AFB, OK
TAFB Technical Sprcifications 2019
U.S. GREEN BUILDING COUNCIL (USGBC)
LEED BD+C
(2009; R 2010) Leadership in Energy and
Environmental Design(tm) Building Design
and Construction (LEED-NC)
UL ENVIRONMENT (ULE)
ULE Greenguard
UL Greenguard Certification Program
WINDOW AND DOOR MANUFACTURERS ASSOCIATION (WDMA)
ANSI/WDMA I.S.1A
1.2
(2013) Interior Architectural Wood Flush
Doors
SYSTEM DESCRIPTION
Work in this section includes laminate clad custom casework cabinets as shown on the drawings and as described in this specification. This Section includes high-pressure laminate surfacing and cabinet hardware. All exposed and semi-exposed surfaces, whose finish is not otherwise noted on the drawings or finish schedule, shall be sanded smooth and shall receive a clear finish of polyurethane. Wood finish may be shop finished or field applied in accordance with Section 09 90 00 PAINTS AND COATINGS. 1.3
SUBMITTALS
Government approval is required for submittals with a "G" designation; submittals not having a "G" designation are for Contractor Quality Control approval. Submit the following in accordance with Section 01 33 00
SUBMITTAL PROCEDURES:
SD-02 Shop Drawings
The beginning of the document. Download the full file to read on.