BIDDING SCHEDULE
ITEM DESCRIPTION
0001
AMOUNT
Provide all plant, labor, materials, equipment, and supplies in strict accordance with Statement of Work for
UHHZ210404 to REMOVE/REPLACE SLABS AND
SHOULDERS AND MTN/PAINT RUNWAY, RUNWAY, 3901
Option: Provide all plant, labor, materials, equipment, and supplies in strict accordance with Statement of Work for
UHHZ210404 to Replace south Overrun for REMOVE/REPLACE
SLABS AND SHOULDERS AND MTN/PAINT RUNWAY,
RUNWAY, 3901
0002A Option: Provide all plant, labor, materials, equipment, and supplies in strict accordance with Statement of Work for
UHHZ210404 to Replace south Overrun for REMOVE/REPLACE
SLABS AND SHOULDERS AND MTN/PAINT RUNWAY,
RUNWAY, 3901 (Contingency Pricing)
0003 Option: Provide all plant, labor, materials, equipment, and supplies in strict accordance with Statement of Work for
UHHZ150412 to REPAIR TWY C, TAXIWAY, FCLTY/ 3931
Option: Provide all plant, labor, materials, equipment, and supplies in strict accordance with the Drawings and Specifications for
UHHZ160138 to RPR/CORRECT DRAINAGE, STRM DRN
DSPL, FCLTY 8700
0002
0004
TOTAL ==>
Bid Schedule (Blank) - 4-Nov-99
NOTE: We strongly recommended the contractor visit the site to determine the complexity of the work and the amount of material required for this project. Field measurements may have been necessary to determine the size and quantity of materials. Conditions that the Contracting Officer decides would have been obvious or visible to the contractor on inspection at the site visit will not be considered under the Differing Site Conditions provision of the contract.
Bid Schedule (Blank) - 4-Nov-99
Bid Schedule (Blank) - 4-Nov-99
The beginning of the document. Download the full file to read on.
Other documents in this bid
- A.4.2.3 – PAVEMENT CONDITION (7-COLOR PCI RATING)
- DAF PFAS Soil BMPs Playbook
- Day 2 6 PFAS Construction and Best Management Practices
- ESPCP Template v14
- Drainage - Storm Drain Facility 8700 - Specifications
- ONLY UFGS 03 30 00 -Div 1- aphalt and concrete paving
- DAFF 813 Flightline Drainage Correction redacted
- Submittal Register
- Statement of Objectives for PAVE OTA