Corrected Drainage - Storm Drain Facility 8700
Robins Air Force Base

SPECIFICATIONS

Phase IV - Corrected Final

Prepared for:

UHHZ 160138

Prepared by:

December 13, 2023
AE Project #23014

THIS PAGE INTENTIONALLY LEFT BLANK FOR DUPLEX PRINTING

Corrected Drainage – Storm Drain Facility 8700
Robins Air Force Base

UHHZ160138

PROJECT TABLE OF CONTENTS

DIVISION 01 - GENERAL REQUIREMENTS

01005

STATEMENT OF WORK

01040

SITE REQUIREMENTS

01042

AIRFIELD CONSTRUCTION HAZARD MARKINGS

01300

SUBMITTALS AND CONTRACTOR-FURNISHED ITEMS

SUBMITTAL REGISTER

01310

CADD AS-BUILT DRAWINGS

01 35 29.13

HEALTH, SAFETY, AND EMERGENCY RESPONSE PROCEDURES FOR

CONTAMINATED SITES

01 45 00.10 20

QUALITY CONTROL FOR MINOR CONSTRUCTION

01 50 00

TEMPORARY CONSTRUCTION FACILITIES AND CONTROLS

01501

TEMPORARY SERVICES – CONTRACTOR

01540

GREEN PROCUREMENT

01560

ENVIRONMENTAL REQUIREMENTS

01580

SAFETY REQUIREMENTS

01600

PRODUCT REQUIREMENTS

01700

EXECUTION REQUIREMENTS

DIVISION 02 – EXISTING CONDITIONS

02 61 13

02 81 00

EXCAVATION AND HANDLING OF CONTAMINATED MATERIAL

TRANSPORTATION AND DISPOSAL OF HAZARDOUS MATERIALS

DIVISION 03 - CONCRETE

03 30 53

MISCELLANEOUS CAST-IN-PLACE CONCRETE

DIVISION 31 - EARTHWORK

31 11 00

31 23 00.00 20

31 32 19.13

CLEARING AND GRUBBING

EXCAVATION AND FILL

GEOGRID SOIL STABILIZATION

DIVISION 32 - EXTERIOR IMPROVEMENTS

32 11 23

32 92 19

32 92 23

AGGREGATE BASE COURSE

SEEDING

SODDING

APPENDIX

APPENDIX A

GEOTECHNICAL REPORT

-- End of Project Table of Contents --

THIS PAGE INTENTIONALLY LEFT BLANK FOR DUPLEX PRINTING

UHHZ160138

STATEMENT OF WORK – 01005

PART 1 - GENERAL

1.01

STATEMENT OF WORK: This is a general overview of the project. Follow details shown by the specifications and drawings, interpreted in accordance with contract clauses. Note especially DFAR 252.236-7001 regarding designer intent.
A. Location: Accomplish Work at Robins AFB, GA.
B. Pre-Award Submittals. Submit the following before award during non-competitive negotiations: 1. Cost - Cost breakout with base bid, design cost, and options on separate sheets. Provide complete breakouts in similar fashion for each subcontractor. 2. Schedule – The contractor shall submit a schedule from award to construction complete in MS Project or Excel format. A Pre-Construction meeting will be held between the contractor, project manager, building manager/occupant, and contracting representative to determine a construction start date.
C. Price: The original contracted price includes special work times for utility outages and repair of damages. The words "at no additional cost to the Government" apply to all such situations whether

The beginning of the document. Download the full file to read on.