Corrected Drainage - Storm Drain Facility 8700
Robins Air Force Base
SPECIFICATIONS
Phase IV - Corrected Final
Prepared for:
UHHZ 160138
Prepared by:
December 13, 2023
AE Project #23014
THIS PAGE INTENTIONALLY LEFT BLANK FOR DUPLEX PRINTING
Corrected Drainage – Storm Drain Facility 8700
Robins Air Force Base
UHHZ160138
PROJECT TABLE OF CONTENTS
DIVISION 01 - GENERAL REQUIREMENTS
01005
STATEMENT OF WORK
01040
SITE REQUIREMENTS
01042
AIRFIELD CONSTRUCTION HAZARD MARKINGS
01300
SUBMITTALS AND CONTRACTOR-FURNISHED ITEMS
SUBMITTAL REGISTER
01310
CADD AS-BUILT DRAWINGS
01 35 29.13
HEALTH, SAFETY, AND EMERGENCY RESPONSE PROCEDURES FOR
CONTAMINATED SITES
01 45 00.10 20
QUALITY CONTROL FOR MINOR CONSTRUCTION
01 50 00
TEMPORARY CONSTRUCTION FACILITIES AND CONTROLS
01501
TEMPORARY SERVICES – CONTRACTOR
01540
GREEN PROCUREMENT
01560
ENVIRONMENTAL REQUIREMENTS
01580
SAFETY REQUIREMENTS
01600
PRODUCT REQUIREMENTS
01700
EXECUTION REQUIREMENTS
DIVISION 02 – EXISTING CONDITIONS
02 61 13
02 81 00
EXCAVATION AND HANDLING OF CONTAMINATED MATERIAL
TRANSPORTATION AND DISPOSAL OF HAZARDOUS MATERIALS
DIVISION 03 - CONCRETE
03 30 53
MISCELLANEOUS CAST-IN-PLACE CONCRETE
DIVISION 31 - EARTHWORK
31 11 00
31 23 00.00 20
31 32 19.13
CLEARING AND GRUBBING
EXCAVATION AND FILL
GEOGRID SOIL STABILIZATION
DIVISION 32 - EXTERIOR IMPROVEMENTS
32 11 23
32 92 19
32 92 23
AGGREGATE BASE COURSE
SEEDING
SODDING
APPENDIX
APPENDIX A
GEOTECHNICAL REPORT
-- End of Project Table of Contents --
THIS PAGE INTENTIONALLY LEFT BLANK FOR DUPLEX PRINTING
UHHZ160138
STATEMENT OF WORK – 01005
PART 1 - GENERAL
1.01
STATEMENT OF WORK: This is a general overview of the project. Follow details shown by the specifications and drawings, interpreted in accordance with contract clauses. Note especially DFAR 252.236-7001 regarding designer intent.
A. Location: Accomplish Work at Robins AFB, GA.
B. Pre-Award Submittals. Submit the following before award during non-competitive negotiations: 1. Cost - Cost breakout with base bid, design cost, and options on separate sheets. Provide complete breakouts in similar fashion for each subcontractor. 2. Schedule – The contractor shall submit a schedule from award to construction complete in MS Project or Excel format. A Pre-Construction meeting will be held between the contractor, project manager, building manager/occupant, and contracting representative to determine a construction start date.
C. Price: The original contracted price includes special work times for utility outages and repair of damages. The words "at no additional cost to the Government" apply to all such situations whether
The beginning of the document. Download the full file to read on.
Other documents in this bid
- A.4.2.3 – PAVEMENT CONDITION (7-COLOR PCI RATING)
- DAF PFAS Soil BMPs Playbook
- Day 2 6 PFAS Construction and Best Management Practices
- ESPCP Template v14
- ONLY UFGS 03 30 00 -Div 1- aphalt and concrete paving
- DAFF 813 Flightline Drainage Correction redacted
- Submittal Register
- Bid Schedule (Blank)
- Statement of Objectives for PAVE OTA