SITE REQUIREMENTS - 01040

REVISION DATE 10 March 2026

PART 1 - GENERAL

1.01 SPECIAL REQUIREMENTS:

A. Controlled Areas (General):

1. This project (may include) includes work in one or more Controlled Area(s). The Contracting Officer will assist in getting proper notation on personnel badges for applicable areas. ( such as warehouses, the Flightline, Command Posts, and similar.) 2. Use no radios, pagers, or walkie-talkies in these areas. 3. Allow 15 minutes wait at arrival for escorts.
4. The contractor is responsible for all controlled/restricted area badges issued for this project.
A work site phasing plan must be completed and approved by Airfield Management and CE prior to waiver be submitted for coordination.

B. Airfield Zone Waivers:

1. Construction Waiver: UFC 3-260-01, Appendix B, Section B1-2.5.4.7, requires a temporary construction waiver be obtained for construction projects on the airfield that violate airfield clearance criteria. This applies to any construction, construction equipment storage, or hauling of materials or waste products that will take place during the term of the project. The Contractor shall provide the information necessary for the waiver process to the Base Project Manager. The Base Project Manager will in turn provide all necessary information to the Community Planner to begin the waiver process. Do not start any work in the Airfield Zone until the Technical Representative of the Contracting Officer (TRCO = CE Inspector) has provided a copy of the approved waiver to the Contractor. 2. Construction Equipment Permit: If cranes, or aerial lift/work platform equipment is required for construction, the Contracting Officer will work with the Civil Engineering Community Planner to obtain the approval. Any crane, or aerial lift/work platform equipment activity at Robins will require Airfield Management notification to allow for proper NOTAM publication to advise the flying community. Submit a request in writing to the Contracting Officer within 14 days of notice to proceed, but no less than 60 days prior to the start of the work. The request shall detail the schedule for such work, hours of operation, height of the crane, and location (lat/long limits) of the crane. Any crane, or aerial lift/work platform equipment required along the primary surface, frangibility zones, or that will be erected over 100 ft. in height will require an approved FAA Form 7460-1 Notice of Proposed Construction or Alteration to be filed and approved by the FAA. Be prepared to abide by any restrictions noted