DAF PFAS Soil BMPs Playbook
Updated
A PDF document (1.0 MB) attached to FA8501-27-RAPID-PAVE-OTA, from the Department of the Air Force. Due Oct 30, 2026, 3:00 PM (UTC-4).
File name: 2c. DAF PFAS Soil BMPs Playbook.pdf
The full file is for paid members, or buy this bid alone.
Preview
DEPARTMENT OF THE AIR FORCE
WASHINGTON DC
OFFICE OF THE ASSISTANT SECRETARY
March , 2025
MEMORANDUM FOR
M
M
M
FROM: SAF/IEE
1665 Air Force Pentagon
Washington, DC 20330-1665
SUBJECT: Best Management Practices for Addressing Contaminated Soils on Military Construction and Facilities Sustainment, Restoration, and Modernization Projects a
c
a
a
a
h h
a
r
a
ra
r
a
a
h
a
M
ac
ra
r
M ar
r a
M
r c a
h
r ra
r
r c
M
c ca a
c
ca ar
a
a
ac
ca
ra c
r c
c
h
ar
h
r rc
a
a
a
h r
ca
h
h r a
r a
a c
ar
c ar r c
c
a
a a a
h a ach
Practices M
r
a c
r
acr
a
M
a
c r
r a
r
a
c
hc
a
a
ca
h r
Best Management
M r c
h
a c
a
h
r rc
r
a
a h M
ach ar
c
ar
r
r c
The point of contact for this subject is Ms. Michelle Brown, r
r c r [email protected].
r
r
r
a
c
Digitally signed by
BALKUS.NANCY.J.1082115974
Date: 2025.03.04 22:01:57
-05'00'
NANCY J. BALKUS, P.E., SES
Deputy Assistant Secretary of the Air Force
(Infrastructure, Energy, and Environment)
Attachment:
1. Guidance on Best Management Practices for Addressing Contaminated Soils on Military Construction and Facilities Sustainment, Restoration, and Modernization Projects
Best Management Practices for Addressing Contaminated Soils on Military Construction and Facilities Sustainment, Restoration, and Modernization Projects Introduction
Narrative
Background
Applicability
Project Planning
Project Design Considerations and Value Engineering
Project Execution
References and Resources
Acronyms and Abbreviations
Introduction
This document provides guidance on best management practices (BMPs) to avoid, minimize, or manage excavated soil (and dewatering liquid) that is contaminated with hazardous substances, pollutants, or contaminants, specifically per- and polyfluoroalkyl substances (PFAS) at Military Construction (MILCON) and Facility Sustainment, Restoration, and Modernization (FSRM) project sites.
Narrative
Managing contaminated soil and dewatering liquids often incurs substantial additional project costs and delays. These issues can be avoided or minimized through early communication between the project team and the Environmental Restoration Program (ERP) office, thorough programming and planning, adjustments in site location or design, and targeted investigation and segregation of contaminated areas.
The beginning of the document. Download the full file to read on.
Other documents in this bid
- A.4.2.3 – PAVEMENT CONDITION (7-COLOR PCI RATING)
- Day 2 6 PFAS Construction and Best Management Practices
- ESPCP Template v14
- Drainage - Storm Drain Facility 8700 - Specifications
- ONLY UFGS 03 30 00 -Div 1- aphalt and concrete paving
- DAFF 813 Flightline Drainage Correction redacted
- Submittal Register
- Bid Schedule (Blank)
- Statement of Objectives for PAVE OTA