STATEMENT OF OBJECTIVE

Build Only via Other Transactional Authority

01005

1. PURPOSE AND BACKGROUND

1.1. Objective: The objective of this project is to provide all labor, material, plant, equipment, supplies, and coordination required to execute the repair of the Runway, Taxiway C and a drainage system at Robins AFB, GA, utilizing a 100% Government-furnished design.
1.2. Background: The current runway and taxiway are deteriorating causing cracking, displacements, and ruts. The drainage located near the south of the runway is currently overgrown and needs to be adjusted. The work area is congested and impacted by various airfield operations. The runway and taxiway will remain in full or partial operation depending on in the phase of the project. Refer to the phasing plan for more details 1.3. OTA & RAPID Framework Approach: This project is being executed as an Area of Interest (AOI) under the overarching RAPID (Robins Agile Practices for Infrastructure Development) Umbrella Program Notice. In accordance with the RAPID framework, this project utilizes a Build-Only execution approach under the standalone statutory authority of 10 U.S.C. § 2808a.
Because the Government has provided a 100% completed design package and/or specific phasing and repair requirements, this project does not contain a collaborative design-builder phase. Instead, it transitions directly to rapid construction execution under a OTA structure to bypass administrative procurement lag

2. EVALUATION AND SELECTION CRITERIA

2.1. Overview

The Government will utilize a two-step, Best-Value selection process mapped to the RAPID framework to select the Company. The evaluation process consists of:
•
•

Step 1 RAPID Phase 1 Equivalent
Evaluation of written Solution Brief to establish a short-list of the most highly qualified firms. Price is not evaluated in Step 1.
Step 2 RAPID Phases 2 & 3 Equivalent
Interactive Pitch Presentations/Interviews and evaluation of the Price Proposal (short-listed teams only) to determine the final best-value selection.

2.2. Step 1: Statement of Qualifications (SOQ) Evaluation Factors •

•

•

01005 - 1 of 12

Factor 1: Past Relevant Construction Experience
o Minimum Requirement: The Company must demonstrate a minimum of five (5) years of experience successfully executing construction projects of comparable size, scope, and complexity. Contractors must have previous experience on Government runway/ taxiway projects that entail repair or replacement or new construction