1.

PROJECT DESCRIPTION/LOCATION

SITE INSPECTION AND MAINTENANCE

PROJECT IS LOCATED IN THE CITY OF EL PASO, IN EL PASO COUNTY, WITHIN THE REGION BOUNDED BY ORANGE ST, HAAN RD, BRADLEY RD, LIBERTY EXPY. LATITUDE +/-31.8124 N, LONGITUDE +/-106.4213 W. THE SITE ENCOMPASSES 37.57 ACRES.

CONTRACTOR SHALL PROVIDE NAME, CONTACT INFO, AND TRAINING DOCUMENTATION FOR THE PERSON RESPONSIBLE FOR SWPPP IMPLEMENTATION AND INSPECTION/MAINTENANCE OF BMPS. INSPECT THE ENTIRE CONSTRUCTION SITE A MINIMUM OF ONCE EVERY SEVEN DAYS DURING ACTIVE CONSTRUCTION AND WITHIN 24 HOURS AFTER A RAINFALL EVENT GREATER THAN 0.5 INCHES IN 24 HOURS. INSPECT ALL TEMPORARY AND PERMANENT WATER QUALITY MANAGEMENT, EROSION PREVENTION AND SEDIMENT CONTROL BMPS UNTIL THE SITE HAS UNDERGONE FINAL STABILIZATION AND THE NOT HAS BEEN SUBMITTED. INSPECT SURFACE WATER INCLUDING DRAINAGE DITCHES FOR SIGNS OF EROSION AND SEDIMENT DEPOSITION. INSPECT CONSTRUCTION SITE VEHICLE EXIT LOCATIONS FOR EVIDENCE OF TRACKING ONTO PAVED SURFACES. INSPECT SURROUNDING PROPERTIES FOR EVIDENCE OF OFF SITE SEDIMENT ACCUMULATION.

THE PLANNED SCOPE OF THE PROJECT INCLUDES:

A

·
·
·
·

THE INSTALLATION OF EROSION CONTROL MEASURES AS REQUIRED FOR THE MASS GRADING OF

THE SITE FOR THE INSTALLATION OF PRE-CAST BURIAL CRYPTS. GRADING AS REQUIRED FOR THE INSTALLATION OF THE STRUCTURES, ROADS AND PARKING LOTS. INSTALLATION OF STORM SEWER.
PLACEMENT OF CONCRETE AS REQUIRED TO ESTABLISH CURB, GUTTER, AND DRAINAGE CHANNEL THROUGHOUT THE SITE.

THESE WATERS ARE LOCATED WITHIN ON MILE (AERIAL RADIUS) OF THE PROJECT LIMITS AND RECEIVE RUNOFF FROM THE PROJECT SITE. DUE TO THE PROXIMITY OF THE RECEIVING WATERS. THE BMPS DESCRIBED IN APPENDIX A OF THE TPDES PERMIT MAY APPLY TO ALL AREAS OF THE SITE. -

A.
B.
C.
D.

STABILIZATION OF ALL EXPOSED SOIL AREAS MUST BE INITIATED IMMEDIATELY TO LIMIT SOIL EROSION BUT IN NO CASE COMPLETED LATER THAN SEVEN (7) DAYS AFTER THE CONSTRUCTION ACTIVITY IN THAT PORTION OF THE SITE HAS TEMPORARILY OR PERMANENTLY CEASED.

E.
F.

B

DATE AND TIME OF INSPECTIONS

NAME OF PERSONS CONDUCTION INSPECTIONS

FINDINGS OF INSPECTIONS, INCLUDING RECOMMENDATIONS FOR CORRECTIVE ACTIONS

CORRECTIVE ACTION TAKEN, INCLUDING DATES, TIMES, AND PARTY COMPLETING MAINTENANCE

ACTIVITIES

DATE AND AMOUNT OF ALL RAINFALL EVENTS GREATER THAN 0.5 INCH IN 24 HOURS

DOCUMENTS AND CHANGES MADE TO THE SWPPP

A.

B.

C.

D.

PROJECT SITE

E.

C

F.

TOPSOIL BERMS MUST BE STABILIZED IN ORDER TO BE CONSIDERED PERIMETER CONTROL BMPS. USE RAPID STABILIZATION METHOD 1, 2, OR 3 AS DIRECTED BY THE ENGINEER.