CLAY ROOF TILES ADD1

Updated

A PDF document (142 KB) attached to Fort Bliss National Cemetery, Gravesite Expansion and FCA Deficiencies, from the Department of Veterans Affairs. Due Nov 12, 2026, 10:00 AM (UTC-7).

File name: 073213 CLAY ROOF TILES_ADD1.pdf

Download the full documentSee the bid

The full file is for paid members, or buy this bid alone.

Preview

Fort Bliss National Cemetery
Gravesite Expansion
El Paso, TX 79906

VA Project 886CM3026
Bid Documents
Addendum 1

SECTION 07 32 13

CLAY ROOF TILES

PART 1 - GENERAL

1.1 SUMMARY

A. Section Includes:

1. Clay roof tiles over underlayment nailed to wood roof sheathing. Section also includes related flashing installation and other requirements specific to the above.

1.2 RELATED WORK

A. Section 06 10 00, ROUGH CARPENTRY:

B. Section 07 01 50.19, PREPARATION FOR RE-ROOFING.
C. Section 07 60 00, FLASHING AND SHEET METAL: Counterflashing and Flashing of Roof Projections.
D. Section 07 92 00, JOINT SEALANTS: Sealants.

1.3 APPLICABLE PUBLICATIONS

A. Comply with references to extent specified in this section.

B. ASTM International (ASTM):

Materials Used as Steep Roofing Underlayment
for Ice Dam Protection.
D4586/D4586M-07(2018)e1.

Asphalt Roof Cement, Asbestos-Free.

Driven Fasteners: Nails, Spikes, and Staples.

1.4 PREINSTALLATION MEETINGS

A. Conduct pre-installation meeting at project site minimum 30 days before beginning Work of this section.

1. Required Participants:

1) Contracting Officer's Representative.
2) Architect/Engineer (at the request of the VA COR and as contracted for the site visit).
3) Contractor.
4) Installer.
5) Manufacturer's field representative (as required by
manufacturer to ensure warrantied installation).

07 32 13 - 1

Fort Bliss National Cemetery
VA Project 886CM3026
Gravesite Expansion
Bid Documents
El Paso, TX 79906
Addendum 1
6) Other installers responsible for adjacent and intersecting work, including flashing and sheet metal.
2. Meeting Agenda: Distribute agenda to participants minimum 3 days before meeting.
1) Installation schedule.
2) Installation sequence.
3) Preparatory work.
4) Protection before, during, and after installation.
5) Installation.
6) Terminations.
7) Transitions and connections to other work.
8) Other items affecting successful completion.
3. Document and distribute meeting minutes to participants to record decisions affecting installation.

1.5 SUBMITTALS

A. Submittal Procedures: Section 01 33 23, SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES.

B. Submittal Drawings:

1. Show size, configuration, and details of custom shapes.

C. Manufacturer's Literature and Data:

1. Description of each product.
2. Installation instructions.

D. Samples:

1. Clay Roof Tiles: Full sized, each type and color.
1) Submit quantity required to show full color range.

E. Operation and Maintenance Data:

The beginning of the document. Download the full file to read on.