TAFB B9001 VAV Schedule
Updated
A PDF document (6 KB) attached to WWYK250063 - Install React VII Facility, B9001, Post V19, from the Department of the Air Force. Due Nov 2, 2026, 2:00 PM (UTC-6).
File name: TAFB B9001 VAV Schedule.pdf
The full file is for paid members, or buy this bid alone.
Preview
Single Duct Terminal Unit Schedule
Tag
AHU
Room
Model
Tag
Size
CFM
Static Pressure
Electric Heat Coil
NC Levels
Electrical
Unit Information
Unit
Outlet
Max
Min
Inlet
Down
Min
Rad.
Disch.
CFM
KW
Volts/Ph.
Steps
EAT
LAT
MCA
MOP
Hand
VAV-01
DESV
12x10
0.25
0.02
S
92.9
4.5
RH
VAV-02
DESV
12x8
0.25
0.13
2.5
S
94.5
3.8
RH
VAV-03
DESV
12x10
0.25
0.07
2.5
S
94.5
3.8
RH
VAV-04
DESV
12x8
0.25
0.16
2.5
S
94.5
3.8
RH
Notes:
9/24/2025 2:44 PM
1. Selections are based on Titus as Manufacturer.
2. All performance based on tests conducted in accordance with ASHRAE 130-2008 and AHRI 880-2011. 3. All NC levels determined using AHRI 885-2008 Appendix E. 4. All airflow, pressure losses and heating performance values have been corrected for altitude. 5. Units of measure: dimensions (in), airflow (cfm), water flow (gpm), air pressure (in wg), water head losses (ft) and temperatures (degF). 6. In the "Steps" column, code "S" denotes a modulating SCR heater. 7. The minimum supply circuit ampacity (MCA) and maximum overcurrent protection (MOP) ratings were calculated in accordance with UL standards based on motor and electric coil full load current ratings.
The results of this program are only an aid to the designer, and are not a substitute for professional design services. Titus accepts no liability for the adequacy of any resulting design or installation. All data subject to change without notice.
The beginning of the document. Download the full file to read on.