Home / WWYK250063 - Install React VII Facility, B9001, Post V19 / Document

Tinkerafb INRMP

Updated

A PDF document (15.8 MB) attached to WWYK250063 - Install React VII Facility, B9001, Post V19, from the Department of the Air Force. Due Nov 2, 2026, 2:00 PM (UTC-6).

File name: tinkerafb_INRMP.pdf

Download the full documentSee the bid

The full file is for paid members, or buy this bid alone.

Preview

U. S. AIR FORCE INTEGRATED NATURAL RESOURCES

MANAGEMENT PLAN

Tinker Air Force Base
Plan No. 32-7064

(See INRMP signature pages and Annual INRMP Review and Update Requirements for plan approval date)

INTEGRATED NATURAL RESOURCES MANAGEMENT PLAN

ABOUT THIS PLAN

This installation-specific Environmental Management Plan (EMP) is based on the U.S. Air Force’s (AF) standardized Integrated Natural Resources Management Plan (INRMP) template. This INRMP has been developed in cooperation with applicable stakeholders, which may include Sikes Act cooperating agencies and/or local equivalents, to document how natural resources will be managed. Non-U.S. territories will comply with applicable Final Governing Standards (FGS). Where applicable, external resources, including Air Force Instructions (AFIs); AF Playbooks; federal, state, local, FGS, biological opinion and permit requirements, are referenced.
Certain sections of this INRMP begin with standardized, AF-wide “common text” language that address AF and Department of Defense (DoD) policy and federal requirements. This common text language is restricted from editing to ensure that it remains standard throughout all plans. Immediately following the AF-wide common text sections are installation sections. The installation sections contain installationspecific content to address local and/or installation-specific requirements. Installation sections are unrestricted and are maintained and updated by AF environmental Installation Support Teams (ISTs) and/or installation personnel.
NOTE: The terms ‘Natural Resources Manager’, ‘NRM’ and ‘NRM/POC’ are used throughout this document to refer to the installation person responsible for the natural resources program, regardless of whether this person meets the qualifications within the definition of a natural resources management professional in DODI 4715.03.

INTEGRATED NATURAL RESOURCES MANAGEMENT PLAN

INTEGRATED NATURAL RESOURCES MANAGEMENT PLAN

The beginning of the document. Download the full file to read on.

Other documents in this bid