Home / WWYK250063 - Install React VII Facility, B9001, Post V19 / Document

Ufc 3 535 01 2017 c4

Updated

A PDF document (19.8 MB) attached to WWYK250063 - Install React VII Facility, B9001, Post V19, from the Department of the Air Force. Due Nov 2, 2026, 2:00 PM (UTC-6).

File name: ufc_3_535_01_2017_c4.pdf

Download the full documentSee the bid

The full file is for paid members, or buy this bid alone.

Preview

UFC 3-535-01

11 April 2017

Change 4, 25 April 2023

UNIFIED FACILITIES CRITERIA (UFC)

VISUAL AIR NAVIGATION FACILITIES

APPROVED FOR PUBLIC RELEASE: DISTRIBUTION UNLIMITED

UFC 3-535-01

11 April 2017

Change 4, 25 April 2023

UNIFIED FACILITIES CRITERIA (UFC)

VISUAL AIR NAVIGATION FACILITIES

Any copyrighted material included in this UFC is identified at its point of use. Use of the copyrighted material apart from this UFC must have the permission of the copyright holder.

U.S. ARMY CORPS OF ENGINEERS

NAVAL FACILITIES ENGINEERING COMMAND

AIR FORCE CIVIL ENGINEER SUPPORT AGENCY (Preparing Activity)

Record of Changes (changes are indicated by \4\ ... /4/) Change No.

Date

7 March 2018

6 April 2021

21 May 2021

25 April 2023

Location
Paragraphs 1-6.4, 1-6.7, 12-1.4.17, and 12-1.8.3
modified; Chapters 13 and 14 deleted.
Paragraphs 1-6.7, 1-11.1.1, 2-5.1.1, 2-5.1.2, 2-5.2,
Figure 3-2, Appendix C, AFIC references throughout
Paragraphs 1-7, 1-8.1.2, 1-8.2.2, Table 2-1A
Chapter 14 inserted to relocate Landing Zone
configuration from UFC 3-260-0 to UFC 3-535-01, for
the purpose of having all lighting configurations in
one UFC. Update for allowance of LEDs is included.

This UFC supersedes UFC 3-535-01, dated 11 April 2017, including Change 3. This UFC will be formatted IAW the UFC Template upon next full revision.

UFC 3-535-01

11 April 2017

Change 4, 25 April 2023

FOREWORD

The Unified Facilities Criteria (UFC) system is prescribed by MIL-STD 3007 and provides planning, design, construction, sustainment, restoration, and modernization criteria, and applies to the Military Departments, the Defense Agencies, and the DoD Field Activities in accordance with USD (AT&L) Memorandum dated 29 May 2002. UFC will be used for all DoD projects and work for other customers where appropriate. All construction outside of the United States is also governed by Status of Forces Agreements (SOFA), Host Nation Funded Construction Agreements (HNFA), and in some instances, Bilateral Infrastructure Agreements (BIA.) Therefore, the acquisition team must ensure compliance with the most stringent of the UFC, the SOFA, the HNFA, and the BIA, as applicable.
UFC are living documents and will be periodically reviewed, updated, and made available to users as part of the Services’ responsibility for providing technical criteria for military construction. Headquarters, U.S. Army Corps of Engineers (HQUSACE), Naval Facilities Engineering Command (NAVFAC), and Air Force Civil Engineer Center (AFCEC) are responsible for administration of the UFC system. Defense agencies should contact the

The beginning of the document. Download the full file to read on.

Other documents in this bid