UFC 3-600-01
8 August 2016
Change 6, 6 May 2021
UNIFIED FACILITIES CRITERIA (UFC)
FIRE PROTECTION ENGINEERING
FOR FACILITIES
APPROVED FOR PUBLIC RELEASE; DISTRIBUTION UNLIMITED
UFC 3-600-01
8 August 2016
Change 6, 6 May 2021
UNIFIED FACILITIES CRITERIA (UFC)
FIRE PROTECTION ENGINEERING FOR FACILITIES
Any copyrighted material included in this UFC is identified at its point of use. Use of the copyrighted material apart from this UFC must have the permission of the copyright holder.
U.S. ARMY CORPS OF ENGINEERS
NAVAL FACILITIES ENGINEERING SYSTEMS COMMAND (Preparing Activity)
AIR FORCE CIVIL ENGINEER CENTER
Record of Changes (changes are indicated by \1\ ... /1/) Change No.
Date
28 Nov 2016
25 Mar 2018
10 May 2019
Location
Change to definition of ‘AHJ’ (paragraph 2-1.3) required modifications to paragraphs 1-7.2.2, 1-9, 9-16.1, and
9-18.5.1. Change to paragraph 9-13.1.3 was a
technical change.
Clarification to definitions Fire Water Demand (2-1.11) and Multi-Family Housing (2-1.26), in addition to many
clarifications of requirements. Paragraphs added for
Hydroelectric Generating Plants(4-20) and Navigation
Locks” (4-31). Change in requirements for Liquid
Oxygen (4.3-33). Army eliminated the requirement for
two water storage tanks. DLA requires redundant fire
pump for large risk facilities. Dry pipe systems require nitrogen.
Added Paragraph 1-2.1.3.1 referring to new Appendix G
Change Paragraph 4-14.1 to apply to all family housing. Added Paragraph 4-46 for wildland-urban interface.
Moved Paragraph 9-2.2.2 to where it should have been
located.
UFC 3-600-01
8 August 2016
Change 6, 6 May 2021
3 Feb 2020
24 Sep 2020
6 May 2021
Clarified Paragraph 9-5.3.2 to follow NFPA 20 for run
time.
Changed Paragraph 9-6.3.5 friction loss requirements.
Added Paragraph 9-19.2.3, CO detection for large
spaces.
Added Appendix G, requirements for Host Nation
projects in Japan.
Some changes made to clarify requirements.
Added/changed requirements (9-9.3 and 9-17) to
comply with 2020 NDAA.
Added 4-38.2 to allow FEMA approved Tank and Pump
Systems.
Other changes added clarity.
Added section 4-2, Additive Manufacturing to address
3-D printing.
Added section 4-39, Privacy Pods or Privacy Enclosures
Included Lake Projects to section 4-32, Navigation
Locks.
Added a requirement in section 4-32 to protect hydraulic reservoir and pumping equipment.
Added section 10-5, Communicating Space to provide
clarity to the code allowances.