Home / WWYK250063 - Install React VII Facility, B9001, Post V19 / Document

Ufc 3 601 02 2021

Updated

A PDF document (2.1 MB) attached to WWYK250063 - Install React VII Facility, B9001, Post V19, from the Department of the Air Force. Due Nov 2, 2026, 2:00 PM (UTC-6).

File name: ufc_3_601_02_2021.pdf

Download the full documentSee the bid

The full file is for paid members, or buy this bid alone.

Preview

UFC 3-601-02

7 October 2021

UNIFIED FACILITIES CRITERIA (UFC)

FIRE PROTECTION SYSTEMS

INSPECTION, TESTING,

AND MAINTENANCE

APPROVED FOR PUBLIC RELEASE; DISTRIBUTION UNLIMITED

UFC 3-601-02

7 October 2021

UNIFIED FACILITIES CRITERIA (UFC)

FIRE PROTECTION SYSTEMS

INSPECTION, TESTING, AND MAINTENANCE

Any copyrighted material included in this UFC is identified at its point of use. Use of the copyrighted material apart from this UFC must have the permission of the copyright holder. Indicate the preparing activity beside the Service responsible for preparing the document.

U.S. ARMY CORPS OF ENGINEERS

NAVAL FACILITIES ENGINEERING SYSTEMS COMMAND

AIR FORCE CIVIL ENGINEER CENTER (Preparing Activity)

Record of Changes (changes are indicated by \1\ ... /1/) Change No.

Date

Location

This UFC supersedes UFC 3-601-02, dated 8 September 2010.

UFC 3-601-02

7 October 2021

FOREWORD

The Unified Facilities Criteria (UFC) system is prescribed by MIL-STD 3007 and provides planning, design, construction, sustainment, restoration, and modernization criteria, and applies to the Military Departments, the Defense agencies, and the DoD field activities in accordance with USD (AT&L) Memorandum, dated 29 May 2002. UFC will be used for all DoD projects and work for other customers where appropriate. All construction outside of the United States is also governed by Status of Forces Agreements (SOFA), Host Nation Funded Construction Agreements (HNFA), and in some instances, Bilateral Infrastructure Agreements (BIA.) Therefore, the acquisition team must ensure compliance with the most stringent of the UFC, the SOFA, the HNFA, and the BIA, as applicable.
UFC are living documents and will be periodically reviewed, updated, and made available to users as part of the Services’ responsibility for providing technical criteria for military construction. Headquarters, U.S. Army Corps of Engineers (HQUSACE), Naval Facilities Engineering Systems Command (NAVFAC), and Air Force Civil Engineer Center (AFCEC) are responsible for administration of the UFC system. Defense agencies should contact the preparing Service for document interpretation and improvements. Technical content of UFC is the responsibility of the cognizant DoD Working Group. Recommended changes with supporting rationale may be sent to the respective DoD Working Group by submitting a Criteria Change Request (CCR) via the internet site listed below. UFCs are effective upon issuance and are distributed only in electronic media from the following source:
• Whole Building Design Guide web site http://www.wbdg.org/ffc/dod.

The beginning of the document. Download the full file to read on.

Other documents in this bid