Attachment 5 -APP B - PROJECT MANUAL
Updated
A PDF document (5.3 MB) attached to FCI Three Rivers-Replace Generators, Transformers, and Electrical Infrastructure, from the Federal Prison System / Bureau of Prisons. Due Nov 30, 2026, 11:00 AM (UTC-5).
File name: Attachment 5 -APP_B_-_PROJECT_MANUAL.pdf
The full file is for paid members, or buy this bid alone.
Preview
KIMBERLY
HUDSON
PROJECT MANUAL
for
Federal Bureau of Prisons
Replace Generators 1 and 2/Infrastructure/Transformer
1700 TX-72
Three Rivers, Texas
Project No.: 23Z5AU6
Contract No: 15B50020D00000007
Task Order: 15BFA024F00000011
425 West Gray Street
Norman, OK 73069
Phone: (866) 226-8071
Construction Documents
Issued: March 6, 2025
Property of the United States Government
Copying, disseminating, or distribution of these documents to unauthorized persons is prohibited.
Do not remove this notice
Properly destroy document when no longer needed.
SENSITIVE BUT UNCLASSIFIED - SBU
Digitally signed by
KIMBERLY HUDSON
Date: 2026.02.17 19:09:35
-05'00'
PROJECT MANUAL
Replace Generators 1 and 2/Infrastructure/Transformer
1700 TX-72
Three Rivers, Texas
Owner’s Project No.
24Z5AU6
Contract Number:
Task Order:
15B0020D0000007
15BFA024F00000011
Architect:
Prime Architects
212 North Crawford
Norman, Oklahoma 73069
866-226-8071
Specifications Consultant: Rosa D. Cheney AIA, PLLC
4075 Wilson Boulevard, 8th Floor
Arlington, Virginia 22203
703-650-7442
Mechanical, Plumbing,
Electrical Engineers:
Coffman Engineers, Inc.
1505 Lyndon B Johnson Freeway, Suite 240
Dallas, Texas 75234
469-208-9433
Civil Engineer:
Coffman Engineers, Inc.
1505 Lyndon B Johnson Freeway, Suite 240
Dallas, Texas 75234
469-208-9433
Issued:
March 6, 2025
Federal Bureau of Prisons
Replace Generators, Associated Infrastructure, and Transformer Three Rivers, Texas
Prime Architects
Norman, Oklahoma
March 6, 2025
DOCUMENT 000107
SEALS PAGE
1.01 ARCHITECT'S CERTIFICATION
A. I, Gene Lavastida, hereby specify that the specifications intended to be authenticated by my seal are limited to:
Division 02
Division 05
Division 06
Division 07
Division 08
Division 09
and I hereby disclaim any responsibility for all other specifications related to or intended to be used for any part or parts of the "Replace Generators 1 and 2/Infrastructure/Transformer" project.
SEALS PAGE
000107 - 1 of 6
Federal Bureau of Prisons
Replace Generators, Associated Infrastructure, and Transformer Three Rivers, Texas
Prime Architects
Norman, Oklahoma
March 6, 2025
1.02 FIRE SUPPRESSION ENGINEER'S CERTIFICATION
A. I, Dave Gramlich, hereby specify that the specifications intended to be authenticated by my seal are limited to:
Division 21
and I hereby disclaim any responsibility for all other specifications related to or intended to be used for
The beginning of the document. Download the full file to read on.
Other documents in this bid
- Attachment 1: Solicitation No
- Attachment 11: Whistleblower Information- Employee Rights
- Attachment 2: EVALUATION FACTORS AND BASIS FOR AWARD
- Attachment 3: Statement of Work TRV 24Z5AU6
- Attachment 9: SF24-Bid Bond
- Cover Letter Request for Quote Solicitation
- Cost Summary Spreadsheets
- Instructions to Offerors Three Rivers Generators
- Three Rivers Generators Pre-Bid Meeting Minutes
- Attachment 4 -APP A-DRAWINGS
- Attachment 6 -APP E - LIGHT CALCS
- Attachment 7: BASIS OF DESIGN MANUAL