Home / FCI Three Rivers-Replace Generators, Transformers, and… / Document

Attachment 6 -APP E - LIGHT CALCS

Updated

A PDF document (1.6 MB) attached to FCI Three Rivers-Replace Generators, Transformers, and Electrical Infrastructure, from the Federal Prison System / Bureau of Prisons. Due Nov 30, 2026, 11:00 AM (UTC-5).

File name: Attachment 6 -APP_E_-_LIGHT_CALCS.pdf

Download the full documentSee the bid

The full file is for paid members, or buy this bid alone.

Preview

COFFMAN ENGINEERS

1505 LYNDON B JOHNSON FWY

SUITE 240, DALLAS TX

Project

FEDERAL BUREAU OF PRISONS THREE RIVERS

REPLACE GENERATORS 1&2

ENLARGED

POWERHOUSE LIGHTING

ELECTRICALSITE

CALCULATION

COVERSHEET

CALCULATIONS

Date:10/14/2024
0.5

0.6

0.7

0.9

1.0

1.2

1.4

1.6

1.7

1.8

1.9

1.9

1.9

1.9

1.9

1.9

2.0

2.0

2.1

2.1

2.2

2.3

2.3

2.3

2.2

2.1

1.9

1.7

1.4

1.1

0.8

0.6

0.4

0.3

0.2

0.2

0.1

0.1

0.1

0.6

0.7

0.9

1.1

1.3

1.5

1.7

2.0

2.1

2.2

2.2

2.1

2.0

2.0

2.0

2.0

2.1

2.1

2.2

2.4

2.5

2.5

2.6

2.7

2.6

2.6

2.5

2.2

1.9

1.5

1.1

0.8

0.6

0.4

0.3

0.2

0.2

0.2

0.1

0.6

0.8

1.0

1.2

1.4

1.6

1.9

2.2

2.2

2.2

2.3

2.1

1.9

1.9

1.8

1.8

1.9

2.0

2.0

2.1

2.3

2.3

2.6

2.8

2.8

2.8

2.8

2.6

2.3

2.0

1.5

1.1

0.8

0.5

0.4

0.3

0.2

0.2

0.2

0.6

0.8

0.9

1.2

1.4

1.6

1.7

1.9

2.0

2.0

2.0

1.6

1.6

1.6

1.4

1.3

1.3

1.5

1.4

1.7

2.2

2.2

2.3

2.3

2.6

2.9

2.9

2.8

2.7

2.4

1.9

1.4

1.0

0.7

0.5

0.4

0.3

0.2

0.2

0.5

0.6

0.8

1.0

1.2

1.3

1.2

1.5

2.0

2.0

1.7

1.1

0.9

0.8

0.7

0.6

0.6

0.7

0.7

1.0

1.6

2.0

1.8

1.6

1.9

2.6

2.7

2.8

2.9

2.7

2.3

1.8

1.4

1.0

0.7

0.5

0.4

0.3

0.3

0.3

0.4

0.4

0.5

0.6

0.7

0.6

0.7

1.1

1.2

0.9

0.6

0.5

0.4

0.3

0.3

0.3

0.4

0.5

0.8

1.1

1.2

1.0

0.8

1.0

1.5

1.9

2.3

2.7

2.7

2.5

2.1

1.7

1.3

1.0

0.8

0.6

0.4

0.4

0.1

0.2

0.2

0.2

0.2

0.3

0.4

0.6

0.8

0.0

0.7

0.5

0.4

0.3

0.3

0.2

0.3

0.3

0.4

0.5

0.7

0.8

0.7

0.7

0.7

0.9

1.3

2.0

2.4

2.4

2.5

2.1

1.8

1.6

1.3

0.8

0.6

0.5

0.6

0.1

0.1

0.1

0.1

0.2

0.2

0.3

0.3

0.4

0.0

0.3

0.3

0.2

0.2

0.2

0.2

0.2

0.2

0.2

0.3

0.3

0.4

0.5

0.6

0.7

0.8

1.1

1.9

2.5

2.4

2.5

2.1

1.8

1.9

1.6

1.0

0.8

0.7

0.5

0.3

0.4

0.5

0.7

1.2

1.6

1.9

2.1

2.1

1.8

1.8

2.0

1.9

1.3

1.1

0.9

0.8

0.2

0.3

0.4

0.5

0.8

1.3

1.3

1.4

1.7

1.6

1.6

2.1

2.0

1.4

1.6

1.8

1.4

0.2

0.2

0.3

0.4

0.6

0.9

1.1

1.1

1.3

1.2

1.4

1.4

2.1

1.4

1.9

2.2

1.8

0.1

0.2

0.3

0.4

0.5

0.7

1.0

1.1

1.2

0.8

1.1

1.4

2.5

1.9

2.7

3.1

2.7

0.1

0.1

0.2

0.3

0.5

0.7

0.9

1.2

1.4

0.8

1.1

1.6

3.1

2.5

2.9

2.8

1.1

0.1

0.2

1.8

2.5

2.4

1.2

0.1

0.1

2.2

0.3

2.1

2.1

1.2

1.5

0.1

2.7

0.3

1.7

1.5

0.0

2.8

2.2

2.2

1.2

1.6

THIS PAGE HAS BEEN INTENTIONALLY LEFT BLANK

2.4

2.6

2.4

1.6

1.0

1.7

COFFMAN ENGINEERS

1505 LYNDON B JOHNSON FWY

SUITE 240, DALLAS TX

Project

FEDERAL BUREAU OF PRISONS THREE RIVERS

REPLACE GENERATORS 1&2

ENLARGED SITE POWERHOUSE LIGHTING

CALCULATIONS

Date:03/05/2025
0.4

0.5

0.6

0.6

0.7

0.8

0.9

1.0

1.1

1.2

1.3

1.5

1.6

1.7

1.8

1.9

2.0

2.0

1.8

1.6

1.5

1.5

1.6

1.7

1.7

1.6

1.2

0.8

0.5

0.6

0.8

1.0

1.2

1.5

1.6

1.8

2.1

2.4

2.7

2.8

2.6

2.2

2.0

1.9

2.1

2.6

3.4

4.2

4.4

3.8

3.2

2.9

2.9

2.9

2.6

2.0

1.3

0.8

0.7

1.0

1.3

1.9

2.7

3.8

5.4

6.8

7.3

6.2

4.6

3.1

2.2

1.7

1.6

1.7

2.1

3.1

4.8

7.0

8.2

7.5

5.9

4.7

4.2

3.9

3.0

1.9

1.2

0.7

0.4

0.6

0.9

1.2

1.8

2.5

3.7

5.3

6.6

6.3

4.6

2.9

2.0

1.4

1.1

1.0

1.0

1.2

1.6

2.3

3.6

4.8

5.0

4.4

3.9

3.9

4.6

4.4

2.5

1.6

1.0

0.5

1.6

1.6

1.6

2.0

2.7

4.2

6.2

4.6

2.1

1.3

0.8

0.4

1.2

2.8

6.2

7.9

4.1

1.8

1.1

0.7

0.5

1.4

3.7

7.4

7.0

3.5

1.6

1.0

1.7

3.6

5.4

4.7

2.7

1.6

1.0

0.7

1.4

2.5

3.2

2.9

2.2

1.3

1.0

0.8

0.8

0.9

0.8

0.5

1.2

1.7

2.1

2.1

1.4

1.1

1.0

1.3

1.6

1.3

1.4

1.8

1.3

1.2

1.2

1.7

2.2

1.9

Z01

0.4

0.6

0.8

1.1

1.4

1.7

2.0

2.2

2.1

1.5

1.0

0.8

0.6

0.4

0.4

0.4

0.4

0.5

0.7

1.1

Z01

Z01

0.8

Z02

1.2

1.8

0.6

2.4

2.3

1.2

2.3

2.3

0.6

1.3

2.1

2.0

0.7

1.7

1.7

1.7

1.3

1.5

2.2

1.6

1.9

2.4

2.4

1.6

2.1

Z02

1.5

2.3

1.0

1.7

1.0

1.9

1.9

1.6

1.4

1.1

1.6

Project

FEDERAL BUREAU OF PRISONS THREE RIVERS

The beginning of the document. Download the full file to read on.

Other documents in this bid