BASIS OF DESIGN MANUAL
CONSTRUCTION DOCUMENTS
Replace Generators 1 & 2 / Infrastructure /
Transformer
1700 TX-72
Three Rivers, TX 78071
Project No. 2403
Architecture
425 Gray Street
Norman, OK 73069
Phone: (866) 226-8071
Engineering
1505 Lyndon B Johnson Fwy, Suite 240
Dallas, TX 75234
Phone: (919) 314-6686
Issued: 6 MARCH 2025
APPENDIX A – DRAWINGS
APPENDIX B – PROJECT MANUAL | SPECIFICATIONS
APPENDIX C – COST ESTIMATE
APPENDIX D – ELECTRICAL CUTSHEETS
APPENDIX E – LIGHTING CALCULATIONS
Federal Bureau of Prisons
Replace Generators, Associated Infrastructure, and Transformer Three Rivers, Texas
Prime Architects
Norman, Oklahoma
March 6, 2025
C
CIVIL DESIGN ANALYSIS
IFC Design
March 6, 2025
C-1
Federal Bureau of Prisons
Replace Generators, Associated Infrastructure, and Transformer Three Rivers, Texas
Prime Architects
Norman, Oklahoma
March 6, 2025
CIVIL BASIS OF DESIGN
1. Scope of Work/Basis of Design
A. Design Concept
Federal Correctional Institution Three Rivers is located south of US Highway 72 in Three Rivers, TX. The existing FCI Three Rivers project site is comprised of an existing Federal Correctional Institution (FCI) that houses adult male offenders at a low security level, and a Satellite Camp (SCP), that houses adult male offenders at a medium security level. The project includes replacement of the backup generators and installation of B loop wiring as original design or the electrical distribution system in accordance with the FBOP technical design guidelines. Site development includes the installation of three new generators at Building N, within the SCP and a secondary electrical power loop with connections to new transformers and switches within the FCI and SCP. Subsequent improvements include trench ground surface restoration in landscape and pavement areas and electrical utility pads for the new generators, transformers and switches.
B. References
Code Reference and Industry Standards Criteria: Design and construction shall comply with the most recently adopted editions of the following guides and standards, and local codes and ordinances.
C. List of References
•
•
•
•
Federal Bureau of Prisons Technical Design Guidelines for New Institution Construction, 2021 American Society for Testing and Materials (ASTM) A1011 / A1011M - 15 Standard Specification for Steel, Sheet and Strip, Hot-Rolled, Carbon, Structural, High-Strength Low-Alloy, HighStrength Low-Alloy with Improved Formability, and Ultra-High Strength
The beginning of the document. Download the full file to read on.
Other documents in this bid
- Attachment 1: Solicitation No
- Attachment 11: Whistleblower Information- Employee Rights
- Attachment 2: EVALUATION FACTORS AND BASIS FOR AWARD
- Attachment 3: Statement of Work TRV 24Z5AU6
- Attachment 9: SF24-Bid Bond
- Cover Letter Request for Quote Solicitation
- Cost Summary Spreadsheets
- Instructions to Offerors Three Rivers Generators
- Three Rivers Generators Pre-Bid Meeting Minutes
- Attachment 4 -APP A-DRAWINGS
- Attachment 5 -APP B - PROJECT MANUAL
- Attachment 6 -APP E - LIGHT CALCS