Attachment 7: BASIS OF DESIGN MANUAL

Updated

A PDF document (470 KB) attached to FCI Three Rivers-Replace Generators, Transformers, and Electrical Infrastructure, from the Federal Prison System / Bureau of Prisons. Due Nov 30, 2026, 11:00 AM (UTC-5).

File name: Attachment 7- BASIS_OF_DESIGN_MANUAL.pdf

Download the full documentSee the bid

The full file is for paid members, or buy this bid alone.

Preview

signed by
KIMBERLY Digitally

KIMBERLY HUDSON

2026.02.17
HUDSON Date:
19:11:38 -05'00'

BASIS OF DESIGN MANUAL

CONSTRUCTION DOCUMENTS

Replace Generators 1 & 2 / Infrastructure /
Transformer
1700 TX-72
Three Rivers, TX 78071
Project No. 2403

Architecture

425 Gray Street
Norman, OK 73069
Phone: (866) 226-8071

Engineering

1505 Lyndon B Johnson Fwy, Suite 240
Dallas, TX 75234
Phone: (919) 314-6686

Issued: 6 MARCH 2025

APPENDIX A – DRAWINGS

APPENDIX B – PROJECT MANUAL | SPECIFICATIONS

APPENDIX C – COST ESTIMATE

APPENDIX D – ELECTRICAL CUTSHEETS

APPENDIX E – LIGHTING CALCULATIONS

Federal Bureau of Prisons
Replace Generators, Associated Infrastructure, and Transformer Three Rivers, Texas

Prime Architects
Norman, Oklahoma
March 6, 2025

C

CIVIL DESIGN ANALYSIS

IFC Design

March 6, 2025

C-1

Federal Bureau of Prisons
Replace Generators, Associated Infrastructure, and Transformer Three Rivers, Texas

Prime Architects
Norman, Oklahoma
March 6, 2025

CIVIL BASIS OF DESIGN

1. Scope of Work/Basis of Design

A. Design Concept

Federal Correctional Institution Three Rivers is located south of US Highway 72 in Three Rivers, TX. The existing FCI Three Rivers project site is comprised of an existing Federal Correctional Institution (FCI) that houses adult male offenders at a low security level, and a Satellite Camp (SCP), that houses adult male offenders at a medium security level. The project includes replacement of the backup generators and installation of B loop wiring as original design or the electrical distribution system in accordance with the FBOP technical design guidelines. Site development includes the installation of three new generators at Building N, within the SCP and a secondary electrical power loop with connections to new transformers and switches within the FCI and SCP. Subsequent improvements include trench ground surface restoration in landscape and pavement areas and electrical utility pads for the new generators, transformers and switches.

B. References

Code Reference and Industry Standards Criteria: Design and construction shall comply with the most recently adopted editions of the following guides and standards, and local codes and ordinances.

C. List of References

•
•
•
•

Federal Bureau of Prisons Technical Design Guidelines for New Institution Construction, 2021 American Society for Testing and Materials (ASTM) A1011 / A1011M - 15 Standard Specification for Steel, Sheet and Strip, Hot-Rolled, Carbon, Structural, High-Strength Low-Alloy, HighStrength Low-Alloy with Improved Formability, and Ultra-High Strength