LOSC ISI Program
Exterior Pressure Vessel Inspection
Date
Inspector/Level
1/24/2024
Brett Strickland / II
Serial Number
750400-1V7
Report Number: CHI-PV-229-VTE-2024
Client
Call Henry Inc.
National Board Number
N/A
Manufacturer & Year Built
Taylor Forge
MAWP
6,000 PSI
Temp. Range
-25 to 140 °F
Commodity
Gaseous Nitrogen
Vessel ID
PV-229
Vessel Type
Horizontal Pressure Vessel
Exam Type
External
Location/Area
SLC-4/HPGSA
Bld. Number
N/A
Room Number
N/A
Required Equipment
Ladder, flashlight, mirror, bubble leak, picks, hammer, ruler, camera
Access Notes
The vessel was located at the High Pressure Gas Storage Area (HPGSA) on SLC-4. Access must be set up in advance with the facility operator, Space X.
Primary
Condition of Heads
Condition of Shell
Evidence of Leakage
Dents/Deformations
Insulation/CUI
Paint
Previous Inspection Documentation
VTE: 2023
GP-R-142002 (2010)
Vessel Inspection
Comments
A/R/F/O
No Comments
Acceptable
No Comments
Acceptable
Leak at top head nozzle flange
Other
No Comments
Acceptable
N/A
No Comments
Acceptable
Areas of minor corrosion, cracked/chipped
Welds
Head to Shell Welds
Longitudinal Weld(s)
Nozzle Welds
Support/Saddle Welds
Skirt/Band Welds
Additional Component Welds
A/R/F/O
Acceptable
Acceptable
Acceptable
Acceptable
Acceptable
Acceptable
Comments
No Comments
No Comments
No Comments
No Comments
No Comments
No Comments
Attachments
Bolts/Flanges
Grayloc Connection
Drain
Other
A/R/F/O
Rejectable
Acceptable
N/A
Other
Comments
Dissimilar metals, leak at top head nozzle flange
No Comments
No Comments
Moderate corrosion on isolation valve
LOSC ISI Program
Vessel Inspection Cont.
Supports
A/R/F/O
Skirts/Bands
Acceptable
Saddle/Steel Support Structure
Acceptable
Anchor Bolting
Acceptable
Pedestal/Grouting
Acceptable
Concrete Pad
N/A
Foundation
Other
Containment
Acceptable
Ladders/Stairs
N/A
Platforms
N/A
Grating
N/A
Handrails/Kickplates
N/A
No Comments
No Comments
No Comments
No Comments
No Comments
Offset/gap between foundations
No Comments
No Comments
No Comments
No Comments
No Comments
Auxiliary Equipment
Gauges
Sensors/Transducer
Sight Glass/Liquid Level
Relief Valve
Grounding
Other
Comments
Missing NCR sticker, @ 4,700 PSI
No Comments
No Comments
The beginning of the document. Download the full file to read on.
Other documents in this bid
- Attachment 1: FRAME Performance Work Statement - draft
- Attachment 2: Apdx H Environmental Reqs - draft
- Attachment 2: Apdx J Antenna Tower Resp List draft
- Attachment 3: Consolidated DID Files draft
- Attachment 4: FRAME Incentive Plan - Draft
- Attachment 5: Appendix B Wage Rate Tables redacted
- Attachment 5: CBA IBEW 2024 12949 Appdx A redacted
- Attachment 6: DB Wage Determination (Mod 5)
- Attachment 6: DB Wage Determination (Mod 6)
- Attachment 8: Section L - draft
- Attachment 9: Section M - draft
- Request for Information Atch 1 Industry Day Agenda 22