In summary, single hazardous material storage cylinders in NFPA fire cabinets are included to satisfy the requirements of NFPA 55 – 7.1.10 “Separation from Hazardous Conditions”. This section requires 20’ between each classification of stored chemicals (Toxics, Flammables, Oxidizers and Corrosives) unless all hazards are in fire cabinets or separated by 0.5 hr fire barriers breaking line of sight. As the room is quite undersized, wall breaks are not able to separate the line of sight between chemical classes, therefore proceeding with NFPA rated fire cabinets. There are added safety benefits: redundant gas monitoring, extra exhaust, contained controls (shutoffs, regulators, purge stations) for neater installation, lockable doors to prevent tampering, and closer/extra sprinklers.
Following the domino effect of incorporating NFPA gas cabinets and integrated control panels, modifications to the exhaust ductwork serving the room (increased by quite a bit), upsized the exhaust fan, which now requires a VFD, adjusted the parameters for AHU-H8-MELAB, and added FP piping and drain to pick up the sprinkler heads built into the cabinets. Additionally, the following electrical addendum notes:
Refer to drawing ME-1, sheet 42:
1. Refer to item EF-H8-STOR, item number 9, change to read: a. 1 HP, 3 phase, nameplate voltage 200, supply voltage 208, 15A-3P circuit breaker, 3-#12 plus 1-#12 ground in ½” conduit, adjustable frequency controller, in lieu of ½ HP, 1 phase, nameplate voltage 115, supply voltage 120, 20A-1P circuit breaker, 2-#12 plus 1-#12 ground in ½” conduit, speed controller noted. Refer to drawing E-6, sheet 48:
1. Wire emergency CV controller panel ECVCP-3 and ECVCP-4 in Tank Storage H8-E (refer to drawing P-1 for exact locations) into LVP-H8-2A circuit 25 with ECVCP-1 and ECVCP-2.
Refer to drawing E-19, sheet 61:
1. Refer to Panelboard Schedule LVP-H8P-1:
a. Change 20A-1P circuit breaker to read 15A-3P circuit breaker.
EX.
J
EX.
J1
EX.
K
EX.
K1
EX.
L
PH
B
EX.
M
EX.
M1
EX.
N
PH
A
PH
PH
PH
PH
EX.
J
EX.
J1
EX.
K
EX.
N
CO A #
EX.
J
EX.
J1
EX.
K
PH
A
E
EX.
N
AT
I R A T ON D
/3
EX P
PH
A
I R A T ON D
AT
E
/3
EX P
CO A #
EX.
EX.
WORKBENCH
6' X 3'
EX.
J
72" X 22"
PICK & PLACE
72" X 32"
STENCIL
PRINTER
27" X 32"
EX.
J1
REFLOW
OVEN
55"x33"
WORKBENCH
7'-6" X 3'
LPKF
3' X 5'
EX.
K
TABLE
PROJECT AREA
18' X 3'
DRAGONFLY
3D PRINTER
EX.
K1
WORKBENCH
15' X 3'
The beginning of the document. Download the full file to read on.
Other documents in this bid
- Attachment 2: Suite H8 Specifications Book Vol 1
- Attachment 3: Suite H8 Specifications Book Vol 2
- Attachment 4: B3 Lighting Floor Plan
- Attachment 5: AFRL Statement of Work-Performance Work Statement Supplemental Requirements (Construction)
- Attachment 6: Price Schedule
- Solicitation - Sep 3
- Bid document
- Bid document
- Plumbing General Purpose
- Bid document
- Bid document
- Metal Wall Panels