Dugway Proving Ground Fugitive Dust Control Plan Form 04 Storage, Hauling and Handling of Aggregate Material

Hauling Materials

Activity Description: The transportation of materials to or from a site.

General Information
Location(s):

Start Date:

End Date:

Point of Contact:

Email:

Phone Number:

Description of site:

Fugitive Dust Emission Control Techniques
Select at least one best management practice (BMP) for each critical mitigation area: Limit visible dust opacity from vehicular operations
BMP 04-01 Apply and maintain water/chemical suppressant to operational areas and haul routes. (Name of chemical:

)

BMP 04-02 Limit vehicle mileage and speed.
Stabilize materials during transport on site
BMP 04-03 Use tarps or other suitable enclosures on haul trucks. BMP 04-04 Apply water prior to transport.
Clean wheels and undercarriage of haul trucks prior to leaving construction site BMP 04-05 Clean wheels.
BMP 04-06 Sweep or water haul road.

Logbook Requirement

All aggregate hauling operations require a logbook to be kept, at minimum, it must contain: the date and amount of aggregate material hauled. If suppression is used, additional logbook entries are required, at minimum, entries must contain: the date, time, type of suppression used (i.e. water/chemical suppressant), amount (in gallons), purpose and location applied.

Trackout Prevention

In accordance with Utah Administrative Code R307-205-6(2), any person(s) performing fugitive dust emission activities will to the maximum extent possible, keep material from being deposited onto any paved road other than a designated deposit site. Any such person(s) who deposits materials that may create fugitive dust on a paved road shall clean the road promptly. *By signing you attest that you have read and understand the requirements of the DPG FDCP and will follow the BMPs you have selected.

Signature

Date

This form is to be completed and kept on record according to the requirements found in the Dugway Proving Ground (DPG) Fugitive Dust Control Plan (FDCP). Copies of form(s) and corresponding logbook entries (if applicable) shall be provided to EP, Air Program Manager, upon the completion of operation(s) and/or annually at the end of each calendar year whichever occurs first. Submit completed form and applicable logbook entries in hardcopy or electronically, via email to Environmental Program’s (EP) Air Program Manager: [email protected]

Environmental Programs
Air Quality Program

FDCP-04

Revision 0