United States Army Garrison Dugway Proving Ground
Technical Exhibit 06
Paving IDIQ Contract – Minimum Sampling & Testing
Directorate of Public Works
[Date]
Part 8 – Materials Manual
Quality Assurance – Appendix C
July 2003
Specification ‐ Material: 02056 Embankment, Borrow and Backfill
UDOT Minimum Sampling and Testing Requirements
Specification - Material: 02056 Embankment, Borrow and Backfill
02056 Embankment, Embankment for Bridge, Granular Borrow, and Backfill Placements
Assurance:
Reference:
Lot Size:
Frequency per Lot:
Point of Acceptance:
Sampling Reference:
Report/Form:
Soil Classification
AASHTO M 145
Source / soil type or each 20,000 cubic yards or 30,000 tons thereafter One per lot
Grade after processing prior to compaction
AASHTO T 2
02056 Free Draining Granular Backfill
Assurance:
Reference:
Lot Size:
Frequency per Lot:
Point of Acceptance:
Sampling Reference:
Report/Form:
Sieve analysis (gradation)
AASHTO T 27 / T 11
Daily Placement
One per 500 tons or 350 cubic yards
Either:
Grade, after processing, prior to compaction.
Or:
Stockpile on the project where approved for daily placement is less than 150 tons or 100 cubic yards.
AASHTO T 2
02056 Embankment, Embankment for Bridge, Granular Borrow, and Backfill Placements
Assurance: Laboratory Maximum Dry Density and Optimum Moisture for Density Standard Reference: AASHTO T 99 Method D / AASHTO T 180 Method D for A‐1 soils Refer to the Materials Manual of Instruction Section 989 for materials too rocky to apply the correction for coarse particles: greater than 30% retained on the ¾” sieve. See AASHTO T 224.
Lot Size:
Frequency per Lot:
Point of Acceptance:
Sampling Reference:
Report/Form:
January 28, 2016
Source / soil type and each 20,000 cubic yards or 30,000 tons thereafter One per 20,000 cubic yards or 30,000 tons for each layer Grade after processing, prior to compaction
AASHTO T 2
UDOT Minimum Sampling and Testing Requirements
Specification ‐ Material: 02056 Embankment, Borrow and Backfill 02056 Embankment, Granular Borrow, and Subgrade Placements
Assurance: In‐place density
Reference: AASHTO T 310. Use the average of two one‐minute readings per test. Lot Size:
Frequency per Lot:
Point of Acceptance:
Sampling Reference:
Report/Form:
Refer to the Materials Manual of Instruction Section 989 for materials too rocky to apply the correction for coarse particles: greater than 30% retained on the ¾” sieve. See AASHTO T 224. A lot equals material placed to line and grade and compacted in one production day
The beginning of the document. Download the full file to read on.
Other documents in this bid
- 1442-Solicitation DPG Horizontal Construction
- Attachment 1: Scope of Work W911S6 Construction Horizontal FY27 - FY 31
- Standard Specification Book Rev
- Paving IDIQ Airfield Specifications
- Materials Manual of Instruction
- Quality Management Plans
- Work Zones
- Dust Control Forms
- TE-09a Fugitive Dust Control Form 01-Crushing
- TE-09b Fugitive Dust Control Form 02-Screening
- TE-09c Fugitive Dust Control Form 03-Stockpiles
- TE-09d Fugitive Dust Control Form 04-Hauling