Home / Dugway Proving Ground (DPG) Horizontal Facility… / Document
Attachment 1: Scope of Work W911S6 Construction Horizontal FY27 - FY 31
Updated
A PDF document (442 KB) attached to Dugway Proving Ground (DPG) Horizontal Facility Construction Road Maintenance, from the Department of the Army. Due Nov 18, 2026, 1:00 PM (UTC-7).
File name: Attachment 1 Scope of Work W911S6 Construction Horizontal FY27 - FY 31.pdf
The full file is for paid members, or buy this bid alone.
Preview
STATEMENT OF WORK (SOW)
FACILITY CONSTRUCTION - HORIZONTAL
INDEFINITE DELIVERY/INDEFINITE
QUANTITY FY 2027 – FY 2031
US Army Garrison Dugway Proving Ground
12 March 2026
1.0
1.11.1
1.11.2
i
1.11.2
1.11.3
1.11.4
1.15.1
1.15.2
1.15.3
1.15.4
1.15.5
1.15.6
1.16.2
2.0
3.0
3.2.4 Contractors that do not Require a CAC, but Require Access to a DoD Facility or Installation . 10
The beginning of the document. Download the full file to read on.
Other documents in this bid
- 1442-Solicitation DPG Horizontal Construction
- Standard Specification Book Rev
- Paving IDIQ Airfield Specifications
- Materials Manual of Instruction
- Min Sampling an Testing
- Quality Management Plans
- Work Zones
- Dust Control Forms
- TE-09a Fugitive Dust Control Form 01-Crushing
- TE-09b Fugitive Dust Control Form 02-Screening
- TE-09c Fugitive Dust Control Form 03-Stockpiles
- TE-09d Fugitive Dust Control Form 04-Hauling