Home / Dugway Proving Ground (DPG) Horizontal Facility… / Document

Standard Specification Book Rev

Updated

A PDF document (1.8 MB) attached to Dugway Proving Ground (DPG) Horizontal Facility Construction Road Maintenance, from the Department of the Army. Due Nov 18, 2026, 1:00 PM (UTC-7).

File name: TE-02 Standard Specification Book Rev 9 June 2025.pdf

Download the full documentSee the bid

The full file is for paid members, or buy this bid alone.

Preview

United States Army Garrison Dugway Proving Ground

Technical Exhibit 02
Paving IDIQ Contract – Roadway and Parking Specifications FY 2027 – FY 2031

Directorate of Public Works
6-9-2025

2026 Standard Specifications
For Road and Bridge Construction

The Department’s Deputy Director of Engineering and Operations and Director of Project Development have reviewed the Standard Specifications included herein and approved them for use with the Department’s construction projects and inclusion in the Department’s construction contracts on the 1st day of January , 2026.

04/29/2025
Carmen Swanwick, Director of Project Development

04/29/2025

Lisa Wilson, Deputy Director of Engineering and Operations

UTAH DEPARTMENT OF TRANSPORTATION

4501 South 2700 West P.O. Box 141200 Salt Lake City, UT 84114-1200 (801) 965-4000 | [email protected]

Introduction
These Standard Specifications are for use in Utah Department of Transportation and are for use in construction contracts at US Army Garrison Dugway Proving Ground. The Standard Specifications are written to the Contractor. They define the Contractor’s responsibility, what the Contractor is expected to provide, and the Department’s expectations. All actions are to be performed by the Contractor unless otherwise noted. A Special Provision may revise the Standard Specification for a specific contract.

Signature Sheet
The Signature Sheet on Page 2 of the 2026 Standard Specification book shows the approval for all Standard Specifications included herein for use with the Department’s construction projects and inclusion in the Department’s construction contracts. The signatures are made by the Department Deputy Director of Engineering and Operations and the Department Director of Project Development.

Specification Index
The Specification Index lists all 2026 Standard Specifications. The Index also lists the date of the last approved change to each specification. The date is a weblink to the Standards Committee Meeting Agenda where a redlined version of the Specification can be viewed with an explanation of the change on the agenda Submittal Sheet. This same link can also be found in the footer of each Specification.

References
Web references within these Standards are listed at
http://www.udot.utah.gov/go/standardsreferences.
Reference to external publications in any 2026 Standard is to the most recent version, issue, or edition in effect on the date of the Notice to Bidders, unless stated otherwise.

Layout

SECTION NUMBER

The beginning of the document. Download the full file to read on.

Other documents in this bid