Home / Dugway Proving Ground (DPG) Horizontal Facility… / Document

TE-09c Fugitive Dust Control Form 03-Stockpiles

Updated

A PDF document (763 KB) attached to Dugway Proving Ground (DPG) Horizontal Facility Construction Road Maintenance, from the Department of the Army. Due Nov 18, 2026, 1:00 PM (UTC-7).

File name: TE-09c Fugitive Dust Control Form 03-Stockpiles.pdf

Download the full documentSee the bid

The full file is for paid members, or buy this bid alone.

Preview

Dugway Proving Ground Fugitive Dust Control Plan Form 03 Storage, Hauling and Handling of Aggregate Material

Stockpiles (Storage) of Aggregate Materials for Future Use or Export Activity Description: A large accumulated pile of materials, soils, rocks, debris that are being stored on site intended for use or awaiting transport to another location.

General Information
Location(s):

Start Date:

End Date:

Point of Contact:

Email:

Phone Number:

Description of site:

Fugitive Dust Emission Control Techniques
Select at least one best management practice (BMP) for each critical mitigation area: Stabilize surface soils where support equipment and vehicles will operate BMP 03-01 Pre-water and maintain surface soils in a stabilized condition. BMP 03-02 Apply and maintain a chemical stabilizer to surface soils. (Name of chemical:

)

BMP 03-03 Pave area(s).
Stabilize stockpile materials during handling
BMP 03-04 Remove material from the downwind side of the stockpile, when safe to do so. BMP 03-05 Reduce height.
BMP 03-06 Create wind screen.
Stabilize stockpiles after handing
BMP 03-07 Water stockpiles to form a crust immediately. BMP 03-08 Apply and maintain a chemical stabilizer to all outer surfaces of the stockpiles. (Name of chemical:

)

BMP 03-09 Provide and maintain wind barriers on 3 sides of the pile. BMP 03-10 Apply a cover (natural or synthetic).
BMP 03-11 Wind screen.
BMP 03-12 Avoid steep sides to prevent material sloughing. BMP 03-13 Reduce height.

Logbook Requirement

If aggregate materials are being stockpiled, a logbook is required, at minimum, it must contain: the date and amount(s) of aggregate material added or removed to the pile. If suppression is used, additional logbook entries are required, at minimum, entries must contain: the date, time, type of suppression used (i.e. water/chemical suppressant), amount (in gallons), purpose and location applied.

Trackout Prevention

In accordance with Utah Administrative Code R307-205-6(2), any person(s) performing fugitive dust emission activities will to the maximum extent possible, keep material from being deposited onto any paved road other than a designated deposit site. Any such person(s) who deposits materials that may create fugitive dust on a paved road shall clean the road promptly. *By signing you attest that you have read and understand the requirements of the DPG FDCP and will follow the BMPs you have selected.

Signature

Date

This form is to be completed and kept on record according to the requirements found in the Dugway Proving Ground (DPG) Fugitive Dust Control Plan

The beginning of the document. Download the full file to read on.

Other documents in this bid