Home / Dugway Proving Ground (DPG) Horizontal Facility… / Document

TE-09a Fugitive Dust Control Form 01-Crushing

Updated

A PDF document (741 KB) attached to Dugway Proving Ground (DPG) Horizontal Facility Construction Road Maintenance, from the Department of the Army. Due Nov 18, 2026, 1:00 PM (UTC-7).

File name: TE-09a Fugitive Dust Control Form 01-Crushing.pdf

Download the full documentSee the bid

The full file is for paid members, or buy this bid alone.

Preview

Dugway Proving Ground Fugitive Dust Control Plan Form 01 Sand and Gravel Borrow Pit Operations

Crushing of Rock, Soil, or Construction Debris
Activity Description: The process of reducing the size of materials by physical impaction.

General Information
Location(s):

Start Date:

End Date:

Point of Contact:

Email:

Phone Number:

Description of site:

Fugitive Dust Emission Control Techniques
Select at least one best management practice (BMP) for each critical mitigation area: Stabilize surface soils where support equipment and vehicles will operate BMP 01-01 Pre-water and maintain surface soils in a stabilized condition. BMP 01-02 Apply and maintain a chemical stabilizer to surface soils. (Name of chemical: )
BMP 01-03 Pave operational area(s).
Stabilize materials before crushing
BMP 01-04 Pre-water material.
BMP 01-05 Test material to determine moisture content and silt loading, crushing only material that is at optimum moisture content. Stabilize material during crushing
BMP 01-06 Apply water to stabilize material so as to maintain compliance with opacity standards and permit conditions. BMP 01-07 Monitor opacity. Make adjustments to maintain compliance with opacity standards and permit conditions. BMP 01-08 Install wind breaks or use enclosure.
Stabilize material after crushing
BMP 01-09 Water crushed material immediately following crushing. BMP 01-10 Apply and maintain a chemical stabilizer to crushed material. (Name of chemical: )
BMP 01-11 Maintain in enclosure.
BMP 01-12 Minimize height of stockpile.
Traffic
BMP 01-13 Minimize vehicle miles.
BMP 01-14 Reduce truck traffic.
BMP 01-15 Reduce truck speed.
Transfer height
BMP 01-16 Minimize transfer and drop point height.

Logbook Requirement

All crushing operations require a logbook be kept, at minimum, it must contain: the date and amount of material crushed. If suppression is used, (i.e. water/chemical suppressant), additional logbook entries are required, at minimum, entries must contain: the date, time, type of suppression used, amount (in gallons), purpose and location applied.

Trackout Prevention

In accordance with Utah Administrative Code R307-205-6(2), any person(s) performing fugitive dust emission activities will to the maximum extent possible, keep material from being deposited onto any paved road other than a designated deposit site. Any such person(s) who deposits materials that may create fugitive dust on a paved road shall clean the road promptly. *By signing you attest that you have read and understand the requirements of the DPG FDCP and will follow the BMPs you have selected.

The beginning of the document. Download the full file to read on.

Other documents in this bid