Paving IDIQ Airfield Specifications
Updated
A PDF document (2.2 MB) attached to Dugway Proving Ground (DPG) Horizontal Facility Construction Road Maintenance, from the Department of the Army. Due Nov 18, 2026, 1:00 PM (UTC-7).
File name: TE-03 Paving IDIQ Airfield Specifications.pdf
The full file is for paid members, or buy this bid alone.
Preview
United States Army Garrison Dugway Proving Ground
Technical Exhibit 03
Paving IDIQ Contract – Airfield Specifications
Directorate of Public Works
[Date]
**************************************************************************
USACE / NAVFAC / AFCEC / NASA
UFGS-32 01 11.51 (May 2016)
Change 2 - 08/17
Preparing Activity:
USACE
Superseding
UFGS 32 01 11.51 (April 2006)
UFGS 32 01 11.52 (April 2008)
UNIFIED FACILITIES GUIDE SPECIFICATIONS
References are in agreement with UMRL dated July 2020
**************************************************************************
SECTION TABLE OF CONTENTS DIVISION 32 - EXTERIOR IMPROVEMENTS
SECTION 32 01 11.51
RUBBER AND PAINT REMOVAL FROM AIRFIELD PAVEMENTS
PART 1
GENERAL
1.1
UNIT PRICES
1.1.1
Measurement
1.1.2
Payment
1.2
REFERENCES
1.3
ADMINISTRATIVE REQUIREMENTS
1.4
SUBMITTALS
1.5
MECHANICAL REMOVAL EQUIPMENT
1.5.1
Waterblasting Equipment
1.5.2
Sandblasting Equipment
1.5.3
Grinding or Scarifying Equipment
1.6
CHEMICAL REMOVAL EQUIPMENT
1.7
TEST SECTION
1.8
DELIVERY, STORAGE, AND HANDLING
1.9
PROJECT/SITE CONDITIONS
1.9.1
Environmental Requirements
1.9.2
Airfield Traffic Control
1.9.3
Radio Communication
1.9.4
Emergency Landing and Takeoff
1.9.5
Airfield Lighting
1.9.6
Water
1.10
SAFETY
PART 2
2.1
PART 3
PRODUCTS
[RUBBER] [AND] [PAINT] REMOVAL DETERGENTS OR CHEMICALS
EXECUTION
3.1
3.2
3.3
[RUBBER] [AND] [PAINT] REMOVAL
RATE OF REMOVAL
WATER PRESSURE
3.4
CLEANUP AND WASTE DISPOSAL
3.5
3.6
COMPLIANCE TESTING
DAMAGE REPAIR
SECTION 32 01 11.51
Formatted: Centered
-- End of Section Table of Contents --
SECTION 32 01 11.51
**************************************************************************
USACE / NAVFAC / AFCEC / NASA
UFGS-32 01 11.51 (May 2016)
Change 2 - 08/17
Preparing Activity:
USACE
Superseding
UFGS 32 01 11.51 (April 2006)
UFGS 32 01 11.52 (April 2008)
UNIFIED FACILITIES GUIDE SPECIFICATIONS
References are in agreement with UMRL dated July 2020
**************************************************************************
SECTION 32 01 11.51
RUBBER AND PAINT REMOVAL FROM AIRFIELD PAVEMENTS
************************************************************************** NOTE: This guide specification covers the
requirements for removal of rubber deposits and paint from asphalt concrete or portland cement concrete airfield pavements. Adhere to UFC 1-300-02 Unified Facilities Guide Specifications (UFGS) Format Standard when editing this guide specification or preparing new project specification sections. Edit this guide
The beginning of the document. Download the full file to read on.
Other documents in this bid
- 1442-Solicitation DPG Horizontal Construction
- Attachment 1: Scope of Work W911S6 Construction Horizontal FY27 - FY 31
- Standard Specification Book Rev
- Materials Manual of Instruction
- Min Sampling an Testing
- Quality Management Plans
- Work Zones
- Dust Control Forms
- TE-09a Fugitive Dust Control Form 01-Crushing
- TE-09b Fugitive Dust Control Form 02-Screening
- TE-09c Fugitive Dust Control Form 03-Stockpiles
- TE-09d Fugitive Dust Control Form 04-Hauling